Laserfiche WebLink
Groundwater Field Sampling Form Page 1 ofy <br /> Project: KEARNEY-KPFFacility10886-1 Date: 77 I <br /> 'task: Q2 2018 GW Monitoring and Sampling Event Well ID: D- <br /> _'" 'I Crew: Claire Kouba <br /> Well Type' on Extraction Injection Other <br /> Marcelo Azevedo <br /> WELL PURGING — - - <br /> Purge Method Multiplier Purge Volume <br /> Bailer-Type: Well Casing Well Casing Diameter Well Volume Pur ed <br /> Pump-Type: "92 I.D.(in.) Gal./Ft. 2 inch 3 volumes <br /> Other: 2 0.1632 4 inch �� 4 volumes <br /> I9 0.6527 other other JA P <br /> Total Well Depth 6 1.46 <br /> Depth to Water Extraction Wells <br /> Water Column Length Pressure <br /> Volume of Water <br /> Water column length Multiplier x No.Vol. Calculated Purge Vol. Extracted <br /> Extraction/Injection Well <br /> Purge Vol. Purge Rate Tota] Purge Time Totalizer heading (a0 rM 1. i' �- 2 t 3 � <br /> Flow Rate I. J-(C <br /> Total Purge Time / #Vols. Purge Time/Val.. Flow Rate 2. 160 I <br /> GROUNDWATER PARAMETER MEASUREMENTS <br /> Conductivity <br /> Time Gallons pH 4Temp.(C) (µS/cm= (mg/) Turbidity(NTU Color/Odor DTW <br /> mho/cm <br /> Previous Quarter 0 3 <br /> Readings E) ��7 S 7 .ZZ <br /> Start '7l b <br /> Parameter l 1 13 ��Z `� •3 I y S y i S Y L +'LZ 41 (' <br /> Parameter 2 Z .S f g l 3 <br /> Parameter 3 G .Cl n (7 t r 3 <br /> Parameter 4 a ti �{Z U <br /> Parameter 5 � .. I . Z� • �2 - a a I j I `r I •3? <br /> End of Purge <br /> Pump Off ( ``, . 'r'S S r l ZS S�• I •3 7 <br /> Parameter Sensor: Purge Water Storage/Disposal: <br /> TT Drummed onsite <br /> Comments/Purge: 0, t-c—Treat ent Syste <br /> a �.. Other: <br /> Well Sampling <br /> Bailer-Type WEATHER CONDITIONS <br /> Pump-Type Skies Ir Temp. —Ps <br /> Other^ Wind From Sjari<z <br /> Time Sample ID Sample Type Container Number of preservative Lab Sent To <br /> p - <br /> Type <br /> Containers <br /> 1 ,' <br />