Laserfiche WebLink
Groundwater Field Sampling Form Page 2 of <br /> Client: Kearney-KPF Facility 10886-1 Date: <br /> Project Name: Q2 2018 GW Monitoring and Sampling Event <br /> Well ID: <br /> Field Crew: Claire Kouba <br /> Marcelo Azevedo Well Type: Monitor Extraction Injection 01 <br /> GROIJ•11D):VATHt PARAMETER MEASUREMENTS(Continued) <br /> Conductivity DO Turbidity <br /> Time Gallons pH Temp.CC) (µS/cm= (mg/L) (NTU) Color/Odor DTW <br /> nn hoJcnz <br /> End of Purge <br /> Pump off <br /> Recovery <br /> Comments/Sam lin : <br /> Stabilization Criteria <br /> pH+/-0.1 <br /> Temperature+/-3% <br /> SC+/-3% <br /> DO+/-0.3 mR/L <br /> ORP+/- 10 mV <br /> Turbidity +/- 10% <br />