Laserfiche WebLink
Groundwater Field Sampling Form Page 2 of <br /> Client: Kearney-KPF Facility 10886-1 Date: <br /> Project Name: Q4 2018 GW Monitoring and Sampling Event <br /> Well ID: <br /> Field Crew: Marcelo Azevedo <br /> Well Type: Monitor Extraction Injection Ot <br /> Nicole Tucker <br /> GROUNDWATER PARAMETER MEASUREHE S Continued <br /> Conductivity DOTurbidity <br /> Time Gallons pH Temp.(°C) (µS/cm= (mg/L) (NTU) Color/Odor DTW <br /> ui�holcrri <br /> End of Purge <br /> Pump off <br /> Recovery <br /> Comments/Sampling: <br /> Stabilization Criteria <br /> H+/-0.l <br /> Tem erature+/-3% <br /> SC+/-3% <br /> DO+1-0.3mglL <br /> ORP+/- 10 mV <br /> Turbidity +/- 10% <br />