Laserfiche WebLink
Groundwater Field Sampling Form Pagel of r <br /> Project: KEARNEY-KPF Facility 10886-1 Date: <br /> Task: Q4 2018 GW Monitoring and Sampling Event Well ID: /% k) <br /> F;-'a Crew: Marcelo Azevedo <br /> Nicole Tucker Well Type: Monitor [ractiai Injection Other <br /> _ WELL PURGING j <br /> Purge Method Multiplier Purge Volume <br /> Bailer-Type: Well Casing Well Casing Diameter Well Volume Purged <br /> Pump-Type: I.D. in.) Gal./Ft. 2 inch 3 volumes ?" <br /> Other: 2 0.1632 4 inch 4 volumes <br /> 4 0.6527 other �n f other <br /> Total Well Depth I('�. rj ,5 1.46 <br /> Depth to Water Extraction Wells <br /> Water Column Length "I , Q�f Pressure <br /> 41 • 04 <br /> X—L:.Lf 4, X - ` Volume of Water <br /> Water column length Multiplier No.Vol. Calculated Purge Vol. Extracted <br /> f I(• Z- t, :s W",�, Extraction/Injection Well <br /> Purge Vol. Purge Rate Total Purge Time Totalizer Reading <br /> / - Flow Rate 1, w 3 <br /> Total Purge Time #Vols. Purge Time/Vol.. Flow Rate 2. <br /> GROUNDWATER PARAMETER MEASUREMENTS <br /> Conductivity <br /> Time Gallons pH Temp.(°C) (µS/cm= ([DO <br /> Turbidity(NTU) Color/Odor DTW <br /> 1' mho/cm <br /> Previous Quarter <br /> Readings /��t .5a 1��!$v 7. -I ( �'T <br /> Start <br /> Parameter I .�� l� 7 ©. Q �( �, LrCQ/' .(Jw1p ree y <br /> Parameter ;41 -7--( q,--iL <br /> Parameter 3 5 — -;Z- �- • [ `I G s 1 <br /> Parameter 4 -7 j <br /> Parameter 5 <br /> End of Purge <br /> Pump Off <br /> Parameter Sensor: 6th Purge Water Storage/Disposal: <br /> Drummed onsite <br /> Comments/Purge: t3oTreaimen[ i <br /> Other: <br /> Well Sampling <br /> Bailer-Type W EATHER CONDITIONS <br /> Pump-Type apt OA-rLb Skies Temp. 7-0 <br /> Other Wind 4e From v,04AWLS <br /> Time Sample ID Sample Type Container Number of Preservative Lab Sent To <br /> Type Containers <br /> 144 :51- iC F V — It 14 '15-1'fhstenL4 <br />