2 Discussion of 2M8 Treatment <br /> System Activities <br /> Treatment system operation and monitoring was conducted on a monthly basis during Q2 and Q4 2018, when <br /> the treatment system was operating. Monitoring included recording extraction well parameters, sampling the <br /> treatment system effluent for VOCs and 1,4-dioxane, and performing as-needed maintenance of the treatment <br /> system and appurtenances. <br /> Over 36 million gallons of groundwater were treated and discharged to the retention/infiltration basin during the <br /> periods of operation in 2018 (April 4, 2018-July 6, 2018 and October 4, 2018-December 14, 2018). The total <br /> volume of groundwater pumped and treated between April 4 and July 6 was 17,316,260 gallons and the average <br /> flow rate was 154 gallons per minute. The uptime in Q2 was approximately 100%. There were two brief periods of <br /> downtime,on April 19 and May 22; however,they were short enough thatthey had a negligible effect on the percent <br /> uptime in 2018 The total volume of groundwater pumped and treated between October 4 and December 14 was <br /> 19,006,260 gallons and the average flow rate was 153 gallons per minute.The uptime in Q4 was 100%. <br /> 2.1 Treatment System Monitoring <br /> Treatment system monitoring was conducted in 2018 in accordance with MRP R5-2017-0125. Sampling dates are <br /> listed in Table 1, Extraction Well and Treatment System Effluent and Injection Monitoring, and Table 2, Treatment <br /> System Effluent and Injection Monitoring, which also contain results from the monitoring and sampling events. <br /> Samples were collected from the treatment system effluent and analyzed for VOCs and 1,4-dioxane(Table 2).Water- <br /> quality parameters, including pH,electrical conductivity,and temperature,were measured in the field (Table 1). <br /> VOCs and 1,4-dioxane were not detected above their respective reporting limits in any of the treatment system <br /> samples collected from the treatment system effluent(Table 2). <br /> Because treated groundwater is currently discharged to the retention/infiltration basin, applicable monitoring <br /> parameters according to MRP R5-2017-0125 include injection rate,total volume of water injected,and water level. <br /> These parameters are reported in Table 1.Other systems monitored on a monthly basis include the extraction wells. <br /> Extraction rate,volume of water extracted, pressure,and water-level measurements for each of the extraction wells <br /> are recorded monthly and are reported in Table 1. <br /> 2.2 Treatment System Operation and Maintenance <br /> This section presents operation and maintenance activities performed during 2018. This information is also <br /> included in the monthly operation and maintenance reports submitted to the DTSC and CVRWQCB on the 15th of <br /> each month. <br /> As discussed in the post-closure permit application(Dudek 2017b),the treatment system was pulsed in approximately <br /> 3-month cycles in an effort to increase removal efficiency and further decrease concentrations of CDCs at the site. <br /> The treatment system was shut down on January 3, 2018, which began the first three-month planned shutdown <br /> D U D E K 10886-1 <br /> 5 March 2019 <br />