Laserfiche WebLink
Table 11. Post Closure Cost Estimate Detail <br /> TASK UNITS QNTY RATE COST <br /> 1. GROUNDWATER MONITORING AND REPORTING <br /> Groundwater Monitoring (during corrective action measures) <br /> Principal hours 4 $260 $1,040 <br /> Sr. Engineer/PM hours 120 $225 $27,000 <br /> Hydrogeologist/Engineer III hours 48 $135 $6,480 <br /> Hydrogeologist/Engineer II hours 316 $125 $39,500 <br /> Admin hours 24 $105 $2,520 <br /> subtotal $76,540 <br /> Expenses LS $12,000 <br /> Laboratory Analysis <br /> 8260 VOCs samples 47 $67 $3,149 <br /> 82701,4-dioxane samples 33 $90 $2,970 <br /> subtotal $6,119 <br /> Annual Total $94,659 <br /> Groundwater Monitoring and Reporting (post corrective action measures) <br /> Principal hours 4 $260 $1,040 <br /> Sr. Engineer/PM hours 140 $225 $31,500 <br /> Hydrogeologist/Engineer III hours 48 $135 $6,480 <br /> Hydrogeologist/Engineer II hours 400 $125 $50,000 <br /> Admin hours 24 $105 $129 <br /> subtotal $89,149 <br /> Expenses LS $14,000 <br /> Laboratory <br /> 8260 VOCs samples 106 $67 $7,102 <br /> 82601,4-dioxane samples 80 $90 $7,200 <br /> subtotal $14,302 <br /> Annual Total $117,451 <br /> Former Kearney-KPF Facility DUDEK <br /> Stockton, California 1 of 6 2/25/2019 <br />