Laserfiche WebLink
Table 11. Post Closure Cost Estimate Detail <br /> TASK UNITS QNTY RATE COST <br /> 4. GENERAL INSPECTION <br /> Hydrogeologist/Engineer 12 $120 $1,440 <br /> Annual Total $1,440 <br /> 5. COVER AND DRAINAGE SYSTEM MAINTENANCE <br /> Cover Maintenance $800 <br /> Annual Total $800 <br /> 6. MONITORING, COLLECTION AND DISPOSAL SYSTEM MAINTENANCE <br /> Miscellaneous Piping Maintenance - see Task 3 $0 <br /> Basin Maintenance - See Task 3 $0 <br /> Mosquito Abatement For Basin - fish provided by county $0 <br /> Instrument Maintenance - see Task 3 $0 <br /> 5-Year Site-Wide Survey $6,000 $1,200 <br /> As-Needed Well Redevelopment/Repair <br /> Project Manager - Oversight, Coordination hr 12 $225 $2,700 <br /> Engineer- Field Work hr 32 $125 $4,000 <br /> Well Rehab - driller $3,500 <br /> Replacement Pump $1,500 <br /> Electrician $1,500 <br /> Construction Contractor - well vault/pad/piping repair $1,500 <br /> Surveyor - rehabed wells $1,000 <br /> subtotal $15,700 <br /> Annual Total (during corrective action measures) $11,999 <br /> Annual Total (post corrective action measures) $16,900 <br /> Annual Total (post corrective action/detection monitoring) $3,549 <br /> Former Kearney-KPF Facility DUDEK <br /> Stockton, California 4 of 6 2/25/2019 <br />