My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1624
>
2900 - Site Mitigation Program
>
PR0544402
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/18/2019 9:07:29 AM
Creation date
9/18/2019 8:47:30 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544402
PE
2959
FACILITY_ID
FA0025244
FACILITY_NAME
FORMER KEARNEY - KPF FACILITY
STREET_NUMBER
1624
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
95204
APN
11708006
CURRENT_STATUS
01
SITE_LOCATION
1624 E ALPINE AVE
P_LOCATION
01
QC Status
Approved
Scanner
TSok
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
452
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 11. Post Closure Cost Estimate Detail <br /> TASK UNITS QNTY RATE COST <br /> 7. POST CLOSURE PERMIT RENEWALS AND ANNUAL PERMIT FEES <br /> Post Closure Permit Application Preparation (2027, 2037, 2047) $50,000 <br /> DTSC Permit Renewal Fees (2027, 2037, 2047) $50,000 <br /> SWRCB fees for oversight $2,500 <br /> DTSC fees for oversight $2,500 <br /> Annual Total (non-renewal years) $5,000 <br /> Annual Total (renewal years) $105,000 <br /> 8. SECURITY (Treatment System) <br /> Hydrogeologist/Engineer - monthly inspections hour 6 $125 $750 <br /> Fence Contractor - repairs <br /> (based on $3,014 in repairs in the last 12 years) $251 <br /> Annual Total $1,001 <br /> 9. OVERHEAD AND MANAGEMENT COSTS <br /> Kearney oversight/management $10,000 <br /> Annual Total (during corerctive action) $10,000 <br /> Annual Total (during detection monitoring) $7,500 <br /> 10. CONTINGENCY FOR REACTIVATION OF CORRECTIVE ACTION MEASURES <br /> The cost difference between the groundwater monitoring programs during and after corrective <br /> action measures is $22,792. If corrective action measures were restarted, the groundwater <br /> monitoring program would would revert to the less rigorous schedule; thus there is an <br /> approximate 16% contingency already built in. <br /> Former Kearney-KPF Facility DUDEK <br /> Stockton, California 5 of 6 2/25/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.