Laserfiche WebLink
4 3 <br /> Rick Griffin -2- <br /> COMMLJNITY DEVELOPMENT <br /> PA-0900094(SA) <br /> 3. All decorative rocks,cobbles and landscaping shall be removed from the right-0f--way along the entire <br /> frontage. <br /> 4. Onsite parking stalls at the end of a row(e.g.the Phase III stall adjacent to Atkins Road)shall have the ability <br /> to navigate in and out(i.e.with a `hammerhead' or equivalent). <br /> 5. The owner shall execute an `Irrevocable Offer and Agreement to Dedicate Road' to result in a twenty-five <br /> ine of Atkins Road to the property line across the parcel's <br /> 'de right-of-way from the centerline p perp' <br /> {25) foot ws <br /> frontage. (A fee is required for processing per Development Title Table 9-240.2 in addition to a copy of the <br /> Grant Deed and a legal <br /> 1 description of the parcel to be offered for dedication.)(The fee due will be based on <br /> the current fee schedule.) (Development Title Section 9-1150.5) <br /> 6. The Traffic Impact Mitigation Fee shall be required for this development. The fee is due and payable at the <br /> time of building permit application. The fee shall be automatically adjusted July 1 of each year by the <br /> Engineering Construction Cost Index as published by the Engineering News Record. (Resolution R-001133) <br /> 7. The Regional Transportation Impact Fee shall be required for this development. The fee is due and payable at <br /> the time of building permit application.The fee is based on the current schedule. (Resolution R-06-38) <br /> 8. A.copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 9. Verification shall be obtained from the Solid Waste Division {468-3066) that this development has suet the <br /> requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon submittal <br /> of verification. <br /> 10. The developer shall provide drainage facilities and meet the requirements of San Joaquin County <br /> Development Standards to prevent the increased runoff release rate of storm water from discharging onto <br /> other properties. Retention basins shall be fenced with six(6)foot high chain link fence or equal when the <br /> maximum design depth is 18 inches or more. Required retention basin capacity shall be calculated by a <br /> registered civil engineer,licensed contractor or licensed architect prior to release of Building Permit. <br /> (Development Title Section 9-1135) <br /> 11. The proposed project disturbs less than one(1)acre of ground and is not part of a larger plan of common <br /> development. The proposed project shall follow the practices in the County"Small Site Stormwater <br /> Management Plan."The site shall be designed to contain the storm water runoff on site and to prevent offsite <br /> sediment transport. <br /> Informational Notes: <br /> (i.) 'This property is subject to the requirements of San Joaquin County Mosquito&Vector Control District(209- <br /> 982-4675)and the California Health and Safety Code for the prevention of mosquitoes.Best Management <br /> Practices(BMP)guidelines for stormwater devices,ponds and wetlands are available. <br /> i BD: <br /> \Twsrvfp0i\shareslDevSetvicalDPubServCOMMENTS\$AIYR 20091PA-0900094_doc <br /> I <br /> i <br /> Ii! t 4 <br /> E <br />