Laserfiche WebLink
Please Note: Effective 13 October 2014, all letters, documents and other materials that would normally be submitted as <br /> paper copies need to be submitted in PDF and emailed to the Central Valley Water Board Office <br /> at: centralvalleysacramento(aDwaterboards.ca.gov <br /> To ensure that your submittals are routed to the appropriate staff as quickly as possible, the following information should <br /> be included in any email used to transmit documents to this office: Regulated Party Name, Facility Name, County, and <br /> Permit Number or CIWQS Place ID. Documents that are 50 MB or larger should be transferred to a CD, DVD, or flash <br /> drive and mailed to "ECM Mailroom" at the address listed above. <br /> From: Daniel Kramer [mailto:dkramer@petralogix.com] <br /> Sent: Monday, January 26, 2015 10:28 AM <br /> To: Daniel Kramer; Armstrong, Scott@Waterboards; Markus Bokisch <br /> Subject: Proof of Submission - Application for Winery Waste Waiver (Bokisch) <br /> Scott <br /> I wanted to check about a letter of receipt for the small winery waiver application for Bokisch <br /> Vineyards. They are currently attempting to finalize their building and occupancy permit for the tasting <br /> room/winery. Part of the requirement to satisfy the San Joaquin County EHD and Building Department <br /> is a proof of application for waste water permit coverage to the water board. The applicant shall <br /> have at least applied to achieve a waiver or permit (although they don't need to have the <br /> process completed to receive a final on the BP). <br /> Could you or the board potentially produce some sort of email and/or letter which demonstrates that <br /> Bokisch Vineyards is in the application process and has submitted to the water board an application? <br /> This would help them to achieve closure and finalize their building permit. I have attached the owner <br /> on this email as well. <br /> In addition, we are in receipt of your responses for the timing and requirements of the applied <br /> waiver. We understand that the process may take time to review and approve. I have reviewed the <br /> changes in the Form FP 200 and it appears that we have covered all of the main data requirements. I <br /> will amend the form as required based on the board approval in February and can change everything <br /> to the new form if you need that to be completed. Thank you for your time and hope all is well. <br /> Daniel E. Kramer, President <br /> Petralogix Engineering, Inc. <br /> Professional Geophysicist 1078 <br /> Professional Geologist 8657 <br /> Certified Engineering Geologist 2588 <br /> All information and data that is transmitted within this email is confidential and intended for a specific end user. There may be <br /> confidential material herein. This information should not be reviewed, transmitted, disseminated or broadcast by anyone <br /> except the intended recipient. Any use by others is strictly prohibited. If you have received this email in error please contact <br /> our internet security agent atguestions(c)petralogix.com. <br /> 2 <br />