My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
3105
>
2200 - Hazardous Waste Program
>
PR0505946
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2019 7:55:32 PM
Creation date
9/19/2019 8:51:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0505946
PE
2227
FACILITY_ID
FA0003680
FACILITY_NAME
CALIFORNIA TANK LINES INC
STREET_NUMBER
3105
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
17512028
CURRENT_STATUS
01
SITE_LOCATION
3105 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
600
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CLEANUP AND ABATEMENT ORDER <br />CALIFORNIA TANK LINES, INC. <br />SAN JOAQUIN COUNTY <br />-3- <br />2. An investigation to determine the extent of heavy metal and any other <br />contamination in on- and off-site soils, including the drainage system and <br />the sediments of Walker Slough resulting from this spill and any other <br />discharges from the site, including site storm runoff. This investigation <br />shall include proposed cleanup alternatives and shall be conducted <br />according to the following time schedule: <br />a. By 10 April 1987 submit a work plan for this investigation. Include <br />plans for sampling both on- and off-site soils and the slough <br />sediments. <br />b. Within 45 days of Board approval of the work plan, submit a completed <br />report of the investigation, including a selected cleanup alterna- <br />tive. <br />3. Within 30 days of Board approval of an adequate cleanup plan implementation <br />of the actual cleanup must begin and shall be completed according to the <br />approved time schedule. <br />4. By 24 April 1987, submit a complete Report of Waste Discharge for site <br />drainage and any other discharges. Include a complete spill contingency <br />plan that includes, but is not limited to, the following physical measures <br />that will be taken to prevent spill material from leaving the site. <br />WILLIAM N. CROOKS, Executive Officer <br />
The URL can be used to link to this page
Your browser does not support the video tag.