Laserfiche WebLink
SECTION 4 <br />LEAK & SPILL CONTROL PROCEDURES <br />A. Spill Control Leader: Ray Gonsalves <br />B. Safety Equipment On -I land (i.e., fire extinguishers, first-aid kits...) <br />Equipment Location <br />Fire Extinauishers 1 -each truck, each shop, wash rack, office <br />FirstAid Station Main ShP and office <br />Protective F-q-uip.(Suit5. Issued to each employee ,sl ept in locker <br />Face shields. et,� <br />Eye wash & Sae wens Wash rack,wastewater pretreatment facility. <br />C. Spill Control Equipment On -Hand (i.e., absorbent, mop and bucket, cylinder kits...) <br />Equipment Location <br />Absorbent booms New shop <br />Shovels, buckets, etc. New chop <br />Note - Hazardous chemicals stored in contained areas. <br />D. Alarms and monitoring Equipment for leak or spill detection <br />(i.e., plI meters or in-line monitoring devices...) <br />Equipment Location <br />3 pH monitors, 2 pFI Wastewater pretreatment system fully <br />control systems automa isAeration <br />E. BE PREPARED! List clean up companies that you have identified which have the <br />capabilities to assist you during and after a hazardous material incident. <br />(Lists of companies can be obtained through Environmental I lealth (209) 468-3420.) <br />Name Locations 24-11our "Telephone No. <br />1. Self <br />If no Til : �M I a U.a M T; I F-1 i I .. RUM M1 ii --.iota <br />5 <br />