Laserfiche WebLink
I FLANGE BOLT <br /> I <br /> STEEL WASHER(TTP) <br /> 4 a PHENOLIC WASHER(TPP) <br /> RESTORE SURFACE TO a' ° <br /> a UNIFORM TRENCH EXISTING WALL <br /> WATCH EXISRNG TOPSOIL, FULL LENGTH <br /> MORTAR DOME CUT EACH SIDE <br /> _ PLANTS; GRAVEL, DR �& REINFORCED PHENOLIC RESIN <br /> PAVEMENT OR MYLAR SLEEVE(TPP) <br /> 4"DIA SCH 411 GALV STEEL ° . <br /> P05T RLLED W CONCRETE a 6" EXISTING <br /> SE C PAVEMENT a 4 _° e NON-SHRINK GROUT <br /> / EXISTING GRADE <br /> PAINT YELLOW W/(2) 84ND5 OF 1/8"THICK INSULATING <br /> REFLECTORIZED TAPE AT TOP a <br /> GASKET <br /> 48" �,''7 2"A.C. MIN. a ° <br /> OVER CONCRETE a. CONDUIT FLANGE 1 <br /> I <br /> Ir TO"– CONCRETE <br /> O.D VARIES <br /> FINISHED <br /> GRADE � 3fi° (RED) FLANGE NUT(TYP) <br /> I STEEL RISER <br /> SCHEDULE 40 PVC <br /> CONDLIT W/CONDUCTORS I GRADE <br /> 12" O.D.AS REQUIRED v <br /> CONCRETE d i <br /> 36" ENCASEMENT 1 PLAS7C WARNING TAPE(SEE NOTE) . <br /> a AGID ETCH CORED <br /> CABLE IN CONDUIT a', 'a SURFACE p [ n E <br /> 2'-0' AS SPECIFIED ON a (APPLY EPDXY <br /> MAX PLANS BONDING AGENT) <br /> X18"� a <br /> MIN - <br /> e NOTES: <br /> 4" 1, THE INSULATING FLANGE KIT STALL&E FOR WATER SERVICE, SUITABLE FOR WET <br /> NOTE. &DRY LOCATIONS, AND BE OF SAME PRESSURE IM77NC AS THE FLANGE. <br /> THE WARNING TAPE USED FOR ALL CABLES SHALL BE RED BUR14L TAPE 2. THE ALLOY OF THE STEEL WASHERS SHALL BE THE SAME AS IS SPECIFIED FOR <br /> THE FLANGE BOLTS. <br /> 1 BOLLARD (T� TYPICAL CABLE TRENCH SECTION n WALL PENETRATION BY CONDUIT 4 INSULATING FLANGE <br /> CP--20 NOT TO SCALE CP-20 NOT r0 SCALE CP-20 NOT TO SCALE CP-20 NOT TO SCALE <br /> I <br /> GRAPHITE COVER <br /> I HNJDLE <br /> STARRNI POWDER <br /> METAL WELDING POWDER <br /> METAL DISC <br /> FILL EPDXY TO COVER ALL PIPE <br /> CE GRAPHITE MOLD <br /> i <br /> EXPOSED <br /> SURFA <br /> D STEEL&COPPER A „w-t� <br /> MINIMUM OF 1/4' <br /> CABLE–TO--PIPE CABLE <br /> CONNECTION #4 AWG/NMWPE BOND CABLE <br /> (TPP) EXOTHERMIC WELD <br /> SEE DETAIL/F1 SEE DETAIL,? DRAIN CABLE OR SLEEVE <br /> J f=—j f TEST CABLE <br /> STEEL PIPE crv2a (SIZE AS REQD) <br /> k COPPER STEP t FILE SHINY STRUCTURE <br /> METAL CONNECTION AREA TO BARE <br /> SLEEVE <br /> BUrifi DAM STEP 2 STRIP INSULATION FROM WIRE. ATTACH SLEEVE ®� <br /> W/PLUMBERS PUTTY REQUIRED ON J'6 AWG WIRE OR SMALLER <br /> r STEEL PIPELINE <br /> STEP J. HOLD MOLD FIRMLY WITH OPENING AWAY FROM <br /> OPERATOR AND IGNITE WITH FLINT GUN, <br /> 1/2" STEP 4. REMOVE SLAG FROM CONNECTION AND PEEN <br /> 1/4' WELD FOR SOUNDNESS. —� <br /> STEP 5. COVER CONNECTION AND EXPOSED STRUCTURE <br /> SURFACE WITH EPDXY COATING COMPOUND } <br /> PER DETAIL 6/CP-20, <br /> NOTE: <br /> PROCEDURE SHOWN ABOVE IS r0 BE USED AS A GENERAL GUIDE ONLY. <br /> CONSULT MANUFACTURER'S LITERATURE FOR SPECIFIC INSTALLATION INSTRUCTIONS <br /> (-51 BOND CABLE INSTALLATION _ CI CABLEJO-PIPE CONNECTION EXOTHERMIC WELD DEPARTMENrOFMUNICIPAL UTILITIES <br /> CP-20 NOT TO SCALE cP-zD NOT TO SCALE CP-20 NOT r0 SCALE <br /> "' CIN OF STOCK7ON.CALJFORNIA <br /> Ifs <br /> RFCONNENDED: _ <br /> ENGINEERING[,' NAG-a <br /> NO. AEV[SIDNB BY APP DALE GAYN01013 PROTEMON REPAMS SIJVp.ZD arc FO RGrEMAlMS DFSICNED UNDER 713E DIRECTION OF; <br /> 1IUNICIP_1L U'T'ILII'IFS jdh corrosion <br /> 3-20-2018 ° <br /> I)FP�1[tT\IFNT c o n s u l t a n t s, I n c. CAT <br /> yII� ISI {7I {F�I,' I(i�. EnI(/q�{� ]i U17 <br /> Iry'I�{� I�Ji�} <br /> l'OA HOU FPO PRl�/�I_�C7J lJ lllil U17P LS YV R.OoA E.No.OR DATE l�l <br /> "SeoN.7Ari°" 1100 Willow Pass COL ft R.CGp,E.W.CR/n35REG19TRATlOhE%PIPES So a Nn CR 1096 <br /> MUDSmckmn,C4 9i2Du DESIGN:TDH DAT3;;5-3-17 <br /> CG. (92 CA 94520 <br /> M,aax: 9J7�B700 0 <br /> DROWN:TDH DATE 3—�-17 <br /> Tel. (925)927-6630 a tF <br /> alunlcl.uvmmaovrutrnuxr STOCitTON,CRLII:003NIA MUNICIPAL UTILITES DEPARTMENT CHECKED:MA DATE s-3-17 20or-20 Si=73 <br />