Laserfiche WebLink
5.2 BIOLOGICAL RESOURCES <br /> TABLE 5.2-4 <br /> Summary of Potential LEC Impacts on Biological Resources during Demolition and Construction <br /> Sensitive Impacts to Biological Resources <br /> Construction Zone Biological <br /> Location Project Work Size Habitat Type Resources Temporary Permanent <br /> LEC power Grading and 4.4 total acres 3.4 acres of disturbed, Potential nest None None <br /> plant site leveling for previously cleared and trees within 1/4 <br /> construction graded area and 1 acre of mile of proposed <br /> disturbed ruderal habitat site and adjacent <br /> with some cottonwood and to proposed <br /> willow trees laydown areas <br /> Construction Grading, some 9.8 acres Disturbed, and some annual Potential nest None None <br /> laydown gravel grassland with scattered trees within 1/4 <br /> areas trees native and landscape mile of proposed <br /> trees site and adjacent <br /> to proposed <br /> laydown areas <br /> Natural gas Tie-in to Onsite tie-in to existing Disturbed/Developed None None None <br /> pipeline existing PG&E gas line <br /> gas line#108 <br /> Potable Connection to Construction of potable Disturbed/Developed None None None <br /> water supply onsite well water well <br /> well <br /> Process Connection to Onsite tie-in to existing Disturbed/Developed None None None <br /> Water City of Lodi's water line <br /> WPCF <br /> Sanitary Connection to Onsite tie-in to existing Disturbed/Developed None None None <br /> Sewer Line City of Lodi's sewer line <br /> WPCF <br /> 230-kV Connection to Onsite connection to Disturbed/Developed None None None <br /> transmission existing PG& E existing transmission <br /> system transmission system <br /> system <br /> 5.2-24 SAC/371322/082330001(LEC_5.2_BIOLOGICAL_RESOURCES.DOC) <br />