Laserfiche WebLink
,9San Joaquin Valley Revised 3/21/07 <br /> ,R AIR POLLUTION CONTROL DISTRICT <br /> AUTHORITY TO CONSTRUCT <br /> PERMIT NO: N-2697-1-3 ISSUANCE DATE: 02/22/2007 <br /> LEGAL OWNER OR OPERATOR: NORTHERN CALIFORNIA POWER <br /> MAILING ADDRESS: 180 CIRBY WAY <br /> ROSEVILLE, CA 95678 <br /> LOCATION: 12751 N THORNTON RD <br /> LODI, CA 95241 <br /> EQUIPMENT DESCRIPTION: <br /> GENERAL ELECTRIC LM5000 NATURAL GAS FIRED TURBINE ENGINE WITH STEAM INJECTION, SELECTIVE <br /> CATALYTIC REDUCTION WITH AMMONIA INJECTION AND AN OXIDATION CATALYST. THE TURBINE POWERS A <br /> 49 MW ELECTRICAL GENERATOR. MODIFICATION TO CONVERT THE FUEL USAGE LIMIT TO THE TERMS OF <br /> HIGHER HEATING VALUE, REVISE THE EMISSION LIMITS TO CLARIFY THE TIME ALLOWED TO COME INTO <br /> COMPLIANCE, REVISE THE EXISTING DAILY EMISSION LIMITS TO THE PRECISION REQUIRED BY DISTRICT <br /> POLICY APR-1105 (GUIDELINES FOR THE USE OF SIGNIFICANT FIGURES IN ENGINEERING CALCULATIONS), <br /> ADD A SOX EMISSION LIMIT AND ADD A CONDITION REQUIRING THAT ALL RECORDS BE RETAINED FOR AT <br /> LEAST FIVE YEARS. <br /> CONDITIONS <br /> 1. This unit shall be fired solely on PUC-quality natural gas. [District NSR Rule] Federally Enforceable Through Title V <br /> Permit <br /> 2. Operator shall operate and maintain in calibration a system which continuously measures and records: control system <br /> operating parameters, elapsed time of operation, and the exhaust gas NOx, CO and 02 concentrations. [40 CFR 60.334 <br /> (b)(1)(2), District NSR Rule and District Rule 1080] Federally Enforceable Through Title V Permit <br /> 3. The turbine and associated ancillary equipment must be maintained and kept in good operating condition at all times. <br /> [District NSR Rule] Federally Enforceable Through Title V Permit <br /> 4. A selective catalytic reduction(SCR) system shall be installed in the path of the heat recovery boiler where the <br /> temperature range is 450 to 750 degrees F. [District NSR Rule] Federally Enforceable Through Title V Permit <br /> 5. A SCR system shall have an effective catalyst volume of at least 100 cubic feet at all times. [District NSR Rule] <br /> Federally Enforceable Through Title V Permit <br /> CONDITIONS CONTINUE ON NEXT PAGE <br /> YOU MUST NOTIFY THE DISTRICT COMPLIANCE DIVISION AT (209) 557-6400 WHEN CONSTRUCTION IS COMPLETED AND PRIOR TO <br /> OPERATING THE EQUIPMENT OR MODIFICATIONS AUTHORIZED BY THIS AUTHORITY TO CONSTRUCT. This is NOT a PERMIT TO OPERATE. <br /> Approval or denial of a PERMIT TO OPERATE will be made after an inspection to verify that the equipment has been constructed in accordance with the <br /> approved plans, specifications and conditions of this Authority to Construct, and to determine if the equipment can be operated in compliance with all <br /> Rules and Regulations of the San Joaquin Valley Unified Air Pollution Control District. Unless construction has commenced pursuant to Rule 2050, this <br /> Authority to Construct shall expire and application shall be cancelled two years from the date of issuance. The applicant is responsible for complying with <br /> all laws,ordinances and regulations of all other governmental agencies which may pertain to the above equipment. <br /> Seyed Sadredin, Executive Director/APCO <br /> �DAVI WARNER, Director of Permit Services <br /> 1f1 N-2697-1-7:Mar 21 2007 fi OtAM--SCHONHOM Joinl Inspection NOT Required <br /> Northern Regional Office 9 4800 Enterprise Way • Modesto, CA 95356-8718 9 (209)557-6400 9 Fax(209)557-647,5ed on recycled paper.0, <br />