My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
We de <br /> GENERATION SERVICES <br /> THE POWER TO MEET ANY DEMAND California's following and spinning reserves to the California <br /> power consumption demands require three types Information Systems Operator (CAISO), providing <br /> of electricity generation: base load generation to stateside reliabiliity. <br /> supply electricity 24/7, intermediate generation that COMBUSTION TURBINE PROJECT NUMBER 1 These <br /> can follow customer loads throughout the day, and <br /> units provide capacity that can be called upon to <br /> peaking and backup generation for extremely high handle extremely high peak loads or emergencies <br /> loads/problems with the electrical grid. NCPA pro- with California's electrical transmission system. The <br /> vides all three types of generation. real measure of their performance is the availabil- <br /> The vast majority of energy we produce is from ity to operate when called upon. For the fiscal year <br /> renewable/non-greenhouse gas-emitting sources. 2006/07,the availability was 95%. <br /> We are constantly working to find new ways to COMBUSTION TURBINE PROJECT NUMBER 2 This unit is <br /> meet member needs while increasing renewable ideally matched to our members' needs to meet <br /> energy production and reducing greenhouse gas summer peak loads. For 2006/07,the availability of <br /> (GHG) emissions. Some examples of our industry- this power plant was 93%. <br /> leading projects: <br /> GREEN POWER POOL PROJECT In 2006 NCPA initiated <br /> GEOTHERMAL PROJECT NUMBERS 1 AND 2 These four <br /> the Green Power Pool project to help our members <br /> geothermal power plants help our members meet meet their renewable energy targets and provide <br /> renewable energy standards established by their an invaluable source of non-greenhouse gas emis- <br /> local governing boards. The plants harness the sion energy. NCPA issued a request for proposals <br /> energy of The Geysers' steamfield to produce car- for 50 megawatts of renewable non-GHG sources <br /> bon-free electricity for our member communities of energy. Negotiations with potential developers <br /> and districts. <br /> are underway. <br /> CALAVERAS HYDRO PROJECT NCPA's five hydro genera- LODI COMBINED CYCLE PROJECT(LODI ENERGY CENTER) <br /> tion power plants are used as an intermediate load This state-of-the-art combined cycle project, the <br /> following resource, adjusting energy production cleanest and most efficient natural gas power plant <br /> to match our members' loads and contributing to available, will produce energy with 30 to 40% less <br /> statewide reliability. Hydro generation delivers this GHG emissions than purchasing the energy from the <br /> service at a lower cost than any other generation market, while promoting optimum reliability. The <br /> resource, with virtually no greenhouse gas emis- plant is scheduled to become operational in 2012. <br /> sions. The Hydro Project provides the excess load <br />
The URL can be used to link to this page
Your browser does not support the video tag.