My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
rive energy fsior <br /> POWER MANAGEMENT <br /> UNIFIED ACTION OPTIMIZES RESOURCE <br /> SCHEDULING Power Management provides for <br /> the day-ahead, hour-ahead, and real-time sched- <br /> uling and dispatch of NCPA and NCPA member <br /> resources to meet our members' loads. To avoid <br /> price volatility in California's real-time <br /> electricity markets, we continually adjust <br /> generation resources to meet changing <br /> NCPA Metered Sub-System Aggregation <br /> (MSSA) load. This is known as load following. <br /> NCPA is unique in California's electricity markets Other generators that are cost-effective to operate <br /> in that we are the only load following Metered on an hour-by-hour basis are marketed to allow the <br /> Sub-System within the CAISO. Through load fol- CAISO to continually balance its load and genera- <br /> lowing with our owned resources, matching loads tion mix on a second-by-second basis. Generators <br /> and resources in real-time, Power Management that are capable of participating in multiple markets <br /> minimizes the need to purchase or sell energy at are dispatched to capture financial benefits. <br /> unknown prices. This greatly reduces our mem- <br /> NCPA members are also pursuing and have ac- <br /> bers' exposure to price volatility and keeps rates <br /> quired green power generation resources, such as <br /> low for electric consumers. <br /> wind and landfill generation. Another role of NCPA <br /> NCPA resources are scheduled in a variety of Power Management is to schedule these resources <br /> markets to derive the maximum value from those to their full capable output. This includes outage <br /> resources for our project participant members. For coordination for landfill generators, daily schedule <br /> example, generators such as our Cumbustion Tur- true-ups for wind generators, and load adjustments <br /> bine Project 1 (CT1)may have an operating cost that on small hydro resources to accommodate water re- <br /> would not be cost-effective in a day-by-day market; lease requirements. <br /> however, there is benefit to be gained from selling <br /> NCPA Power Management is capable of providing <br /> the capacity of those generators to the CAISO in <br /> the optimal integration of these green resources into <br /> the form of non-spinning reserve. This ancillary <br /> the MSSA portfolio and maintaining high reliability. <br /> service allows NCPA to be paid hourly to have the <br /> generators ready to start and capable of being load- <br /> ed to a certified MW amount within 10 minutes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.