My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. 4. Injection Fluid Monitoring Data <br /> Monitoring <br /> Parameter Frequency Instrument <br /> injection rate, gpm continuous recorder <br /> injection total volume, gallons continuous totalizer <br /> injection pressure, psig continuous recorder <br /> annular. pressure,. psig continuous recorder <br /> injection fluid temperature, deg F. continuous recorder <br /> QThe injection fluid monitoring data is to be recorded <br /> continuously., and a. computer-based data acquisition system may <br /> be used for this :purpose. Each of the above five parameters <br /> G is to be automatically scanned every second, and a continuous <br /> �S• record is to be .made of the injection' rat'e, injection volume <br /> and injection pressure measurements. The continuous annular <br /> pressure and injection fluid temperature measurements are to <br /> be individually.,averaged and recorded each hour. <br /> 5. Calibration o:f Monitoring Ecru inmeht- - Al,l monitoring and <br /> recording equipment shall be"'' calibrated on a regular <br /> basis. The permittee shall submit, to' the ..Directbr; a <br /> report .describing the 'calibration procedures and; the <br /> frequency at which the equipment will. -be 'dal brated. <br /> 6. Automatic Alarms and Shut-Off Devices -, ,The permittee <br /> shall continuously operate and maintain an automatci <br /> warning system which will immediately notify the- <br /> operators of a malfunction in the event:°that the <br /> injection pressure at the wellhead exceeds the maximum <br /> injection pressure authorized by this permit. <br /> 7 . Monitoring Information Records of any monitoring <br /> activity required under this permit- shall include: <br /> (a) The date, exact place, and time of sampling or field <br /> measurements; <br /> (b) The name of the individual(s) who performed the <br /> sampling or measurements; <br /> (c) The exact sampling method(s) used to take samples; <br /> (d) The date(s) laboratory analysise-were=performed; <br /> (e) The name of the indiv dual(s) who performed the <br /> analyses; <br /> i <br /> Page 12 of 31 <br /> UIC Permit #CA194000002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.