Laserfiche WebLink
2 - <br /> E. In the event of any gas or well control problems, immediately commence <br /> r1rcu].atina throiiah the blowdown-circulating line. and mixing barite if <br /> necessary. Never completely close-in the well, unless absolutely . <br /> necessary, due to the extreme likelihood of rupturing around the surface <br /> pipe. <br /> 3501± sacks of barite should be maintained on location at all times . It <br /> is not desirable to close the well completely in due to the shallow depth <br /> of the surface pipe due to the possibility that excessive shut-in pressure <br /> could rupture the casing shoe and cause a rupture on the out-side to <br /> surface, thereby causing complete loss of well control. <br /> If in the weighing up and circulating process, It appears well control Is <br /> In a precarious situation, do not procrastinate about calling out cement <br /> trucks with at least 500 sacks API class "G" with 2% CaC12. A first <br /> alternative to cementing though would be to attempt to pump in a 50-100 <br /> Bbl pill of 120 PCF mud. <br /> 6. Run the (1) dual induction - laterolog with 211 linear correlation and 5" logrithmic <br /> correlation. Use 10 millivolt SP, 0-30 ohm scale and 0-1000 conductivity scale. <br /> and (2) BHC integrated sonic with SP. If a completion proves justified to this <br /> point and/or Is questionable, run: <br /> A. compensated neutron-density log with gamma <br /> B. dipmeter <br /> Note: All logs to be taped. The tapes to be promptly transported to <br /> Schlumberger's Century City office for immediate computor analysis . <br /> 7. If a completion is not justified, hang open-ended drill pipe 100' below the base <br /> of the fresh water sands (estimated C 20001) and equalize a 75 sack plug of API <br /> aJ 0 class "G" cement with 2% CaC12 , Calculated to fill 250 lineal feet. P.O.H. <br /> laying down drill pipe. Equalize a 75 sack plug, hanging 50' below the shoe <br /> 9-5/811 casing C ±675' bringing cement back to at least 50 into 8-5/8" shoe. <br /> \. D.O.G. to witness top of plug @ 625' . With drill pipe hanging at 931 , <br /> b`r equalize a 50 sack plug of API class "G" cement. Release rig. <br /> COMPLETION <br /> 1. If a completion is justified, a 42" -.10 .5 & 11.64 K-55 ST&C casing string will <br /> be run if a single zone completion exists or a 5-11' - 15 .5 & 17# K-55 ST&C casing <br /> string will be run if a dual completion is forthcoming. Cement the completion <br /> string to surface using a pozmix filler cement from 1000' above any potential zone <br /> to surface and neat cement from T.D. to 1000' above any potential zone. Use <br /> turboblade centralizers every other joint through, and 180' above and below any <br /> zone. Use Howco type differential fill-up collar and differential guide shoe. <br /> Install tubing spool. Install 6" - 900 B.O.P.E. <br />