My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
11%o 11�-./ <br /> Well : Piacentine #1-27 Operator: SIERRA RESOURCES, INC. <br /> API#: 04-077-20484 <br /> Field: King Island 5601 Truxtun Avenue <br /> S/T/R: S27-T3N/R5E, MDB&M Suite 250 <br /> County: San Joaquin Bakersfield, CA 93309 <br /> State: California (805) 631-8378 <br /> FAX (805) 631-9761 <br /> Signed•• _ Date: +/3o�9 7 <br /> Robbrt D. er s, Prenden-E Div. of Oil & Sac - Diol 6 <br /> RECEIVED <br /> RECOMPLETION HISTORY MAY 0 5 1997 <br /> ATE REMARKS Sacramento, California <br /> 2/26/97 MIRU Oil Well Service rig. R/U on tree. Pump in well <br /> with lease water and attempt to kill same. Pressured up <br /> to 2000 psi with 30 barrels down tubing. Flowed back 25 <br /> barrels and shut in well with 640 psi SITP. Mix 72 <br /> lb/bbl salt water and kill well with same. N/D Tree and <br /> N/U BOP's with 2-7/8" rams and test same. Released <br /> packer and circulate well . POOH, laid down packer and <br /> stood back tubing. RIH with open ended tubing to 4727 ' <br /> and secured well for night. <br /> 2/27/97 Opened well - no pressure. Pumped 40 bbls lease water <br /> with no returns. R/U cementers and test lines and <br /> manifold. Mix and pump 30 sx neat "G" cement plug and <br /> equalize plug with lease water - CIP @ 10:50 am. POOH <br /> ten stands and reverse circulate clean. Braden head <br /> squeeze to 2000 psi, shut in well under pressure and <br /> secured well for night. <br /> 2/28/97 Opened well - 650 psi SITP. Bled off same and RIH with <br /> tubing, tagging cement @ 45731 . POOH and made up <br /> drilling BHA. Trip in hole with bit and BHA on tubing <br /> string. Tag cement @ 45731 . R/U power swivel and drill <br /> out soft cement from 4573' to 46751 . Circulate clean and <br /> secured well for night to wait on cement. <br /> 3/03/97 Resumed drilling on firm cement from 4675' to 47301 . <br /> Pressure up to 700 psi - broke down taking 2-1/2 <br /> bbls/minute @ 500 psi . POOH and stand back BHA. RIH <br /> with open ended tubing to 47301 . R/U cementers and test <br /> lines and manifold. Mix and pump 30 sx neat "G" cement <br /> W/ 2 . 5% CaCl and equalize plug with lease water - CIP @ <br /> 1 : 30 pm. POOH ten stands and reverse circulate clean. <br /> Braden head squeeze to 2500 psi, shut in well under <br /> pressure and secured well for night to allow cement to <br /> harden. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.