Laserfiche WebLink
Div of Oil &GIS - Dist, 6 <br /> RCCEIVED <br /> RECQMPLETION HISTORY <br /> PAGE 2 MAY 0 5 1997 <br /> Sacramento, California <br /> 3/04/97 Opened well - 1500 psi SITP. Bled off same and RIH with <br /> tubing, tagging cement @ 45561 . POOH and made up <br /> drilling BHA. Trip in hole with bit and BHA on tubing <br /> string. Tag cement @ 45561 . R/U power swivel and drill <br /> out firm cement from 4556' to EZSV retainer @ 47301 . <br /> Continue drilling out retainer , cement and junk to <br /> 47581 , began torquing up badly. POOH and inspect bit. <br /> RIH with same and resumed drilling, changing weight and <br /> RPM - unable to make progress. Pressure up to 900 psi - <br /> well taking fluid @ 2 bbls/minute. Secured well for <br /> night. <br /> 3/05/97 POOH and stand back BHA. RIH with open ended tubing to <br /> 47541 . R/U cementers and test lines and manifold. Mix <br /> and pump 30 sx neat "G" cement w/ 2 .5% CaCl and equalize <br /> plug with lease water - CIP @ 11 : 30 am. POOH ten stands <br /> and reverse circulate clean. Braden head squeeze to 2000 <br /> psi, shut in well under pressure and secured well for <br /> night to allow cement to harden. <br /> 3/06/97 Opened well - 50 psi SITP. Bled off same and RIH with <br /> tubing, tagging cement @ 45511 . POOH and made up <br /> drilling BHA. Trip in hole with bit and BHA on tubing <br /> string. Tag cement @ 45511 . R/U power swivel and drill <br /> out firm cement from 4551 ' to 47401 . Circulate clean and <br /> pressure test squeeze to 1100 psi, test held. Made up <br /> casing scraper and round trip to 47401 . Made up 5-1/2" <br /> x 2-7/8" "Big Bore" R-3 packer and TIH with production <br /> setting as before. Secured well for night. <br /> 3/07/97 Continue TIH with 5-1/2" x 2-7/8" "Big Bore" R-3 packer <br /> and production setting. Set production packer @ 4585' <br /> w/ 12 , 000# in compression. Test packer to 1000 psi on <br /> casing and land tubing. N/D BOP's, N/U and test tree. <br /> Swab fluid down to 15001 . Secured well for night. <br /> 3/08/97 R/U Halliburton wireline and test wireline lubricator. <br /> Attempt to Run TMDL log - hit obstruction @ 47331 . <br /> Unable to clear - forced to trip and reset production <br /> setting to clear obstruction. R/U Halliburton wireline <br /> and test wireline lubricator. Ran TMDL pulsed neutron <br /> log from 4723'- 4490' to determine residual gas <br /> saturations. GIH with 2-1/8" Deep Star thru tubing <br /> perforating gun, 6 shots/ft, Tri-Phase phasing. <br /> Perforate 47001- 4705' DIL. Unload and test well @ + 600 <br /> mcf/day with 1120 psi FTP and 1180 psi SITP. Obtain gas <br /> sample. Rig down and release rig. <br /> i <br />