My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOURCES AGENCY OF CALIFORNIA <br /> DEPARTMENT OF CONSERVATION <br /> DIVISION OF OIL, GAS, AND GEOTHERMAL RESOURCES <br /> No. P 696-354 <br /> PERMIT TO CONDUCT WELL OPERATIONS 351 <br /> (field code) <br /> 00 <br /> (area code) <br /> 10 <br /> (new pool code) <br /> Robert D. Eberts, Agent 10 <br /> SIERRA RESOURCES, INC. (old pool Code) <br /> 5601 Truxtun Ave . , Suite 250 <br /> Bakersfield, CA 93309 Sacramento , California <br /> November 20 , 1996 <br /> Your .. proposal to rework well "Piacentine" 1-27 , <br /> A.P.I. No. 077-20484 ,Section 27 T. 3N R. 5E M.D.B.& M. , <br /> King Island Gas field, Any area, Mokelum-e pool, <br /> San Joactuin County, dated 11/12/96 ., received 11/18/96 has examined in conjunction <br /> with records filed in this office. <br /> THE PROPOSAL IS APPROVED PROVIDED THAT: <br /> 1. Blowout prevention equipment conforming to Class "II" B 2M requirements is installed on <br /> the 5-1/211 casing and maintained in operating condition at all times. See Manual M07. <br /> 2. Wire line operations are conducted through at least a 2 M lubricator. <br /> 3. The Division is furnished copies of any draw down or back pressure tests performed. In <br /> addition, the Division will monitor the production for a period of six months and if <br /> anomalous water production is indicated, remedial action will be ordered. <br /> 4 . THIS DIVISION IS NOTIFIED: <br /> a. Before deviating from the proposed casing programs and/or placing any plugs in the <br /> hole. Additional requirements shall be outlined at that time. <br /> Blanket Bond <br /> RSH: sr <br /> Engineer Robert S. Habel WILLIAM FUERARD,,JpR., State QiI and Gas Supervisor <br /> Phone (916) 322-1110 By <br /> Robert A. Reid, Deputy Supervisor <br /> A copy of this permit and the proposal must be posted at the well site prior to commencing operations. <br /> Records for work done under this permit are due within 60 days after the work has been completed or the <br /> operations have been suspended. <br /> OG111 (2/96/GSR1/6M) <br />
The URL can be used to link to this page
Your browser does not support the video tag.