My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT L <br /> CONSTRUCTION PROCEDURES <br /> L.1 Drilling/Construction History <br /> The STIG #1 well was drilled, tested and completed during <br /> the time period beginning April 29 and ending June 9, 1993 . <br /> These operations were performed under regulations issued by the <br /> Resource Agency of California, Department of Conservation, <br /> Division of Oil and Gas, in accordance with specific provisions <br /> contailed in a Permit issued to NCPA for these purposes on <br /> February 9, 1993. A copy of the completed forms and all <br /> documents filed with or issued by the CDOG for the STIG #1 well, <br /> including the "Notice of Intention to Drill New Well", the <br /> "Permit to Conduct Well Operations" , three "Report on Well <br /> Operations" , the "Well Summary Report" , and the "Well History", <br /> are included as Item #1 in Appendix L. <br /> The daily cronicle of the operations as reported in the <br /> Well History to the CDOG is as follows: <br /> STIG 11 WELL: HISTORY OF DRILLING, TESTING AND COMPLETION <br /> 1993 <br /> Apr 29 MIRU Paul Graham Rig #2, Tex Hillmon, tool pusher. <br /> Spudded in at 4:OOPM through 16" Conductor previously <br /> set at 301 . Drilled 14-3/4" hole to 6141 . Wiped hole, <br /> surveyed and POOH to run casing. Survey @ 6141= 1.5 <br /> deg. <br /> Apr 30 Rigged up and ran 16 jts 10-3/4" 40. 5# K-55 ST&C <br /> casing to 6111 . Circulated hole clean. BJ pumped 10 <br /> bbls water ahead, mixed and pumped 180 sx "G" cmt w/ <br /> 4% Gel, 10#/sx A-10, 3% A-7 & 0. 2% FP8 followed by 150 <br /> sx "G" cmt w/3% CaC12. Bumped plug w/ 500 psi. CIP @ <br /> 3 :OOAM w/ good returns to surface. WOC 2hrs. Cut off <br /> 10-3/4" csg & welded on 10" wellhead. Tested wellhead <br /> to 1000 psi. Nippled up BOP and tested blind rams <br /> to 1000 psi . Made up BHA and RIH. Tested pipe rams to <br /> 1000 psi, witnessed by D.O.G. Drilled out cement and <br /> shoe. Rigged up EnergyLog Mudlogging Services (Ben <br /> Cahill) . Drilled 9-7/8" hole to 11701 . Surveys: @ <br /> 11301= 15min. <br /> L-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.