My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS UIC PERMIT APP
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
ARCHIVED REPORTS UIC PERMIT APP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:59:35 AM
Creation date
9/26/2019 9:22:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
UIC PERMIT APP
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1019
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 7 -Gamma Ray Caliper Log from 4640' to 36601 . RIH and <br /> (contin'd) circulated and conditioned mud for liner, POOH. <br /> May 8 Ran 1287' of 5" 15# K-55 ST&C liner, with shoe at <br /> 46451 , float collar at 4599' and top of hanger at <br /> 33581 . Halliburton pumped 20 bbls mud flush ahead, <br /> mixed and pumped 187 cu ft "G" cmt w/ 350# KC1 and <br /> 157# 322. Displaced w/ 48.4 bbls water. CIP @0510 hrs, <br /> backed out of liner hanger and POOH. WOC 12 hrs. RIH, <br /> top cement at 31111 . Cleaned out cement w/ 6-1/4" bit <br /> to top of liner hanger at 33581 . Tested liner lap to <br /> 500 psi, witnessed by D.O.G, POOH. <br /> May 9 Picked up BHA w/ 4-1/4" bit, RIH and cleaned out <br /> cement from 3358' to 33881 , RIH, CO cmt from 4573' to <br /> 46021 . Circulated clean with mud. Cleaned out mud <br /> tanks and mixed 6% KC1 water. Displaced drilling mud <br /> in hole w/ KC1 water @1100 hrs. POOH, laid down drill <br /> pipe. Tore out BOP, installed cap and valves on tubing <br /> head. Released rig at 1800 hrs. (no operations on May <br /> 10) <br /> May 11 Moved out Paul Graham Drilling Rig #2, MIRU Paul <br /> Graham Production/Completion Rig #3 <br /> May 12 Rigged up Prime Perforating and Flo-Log, RIH and <br /> recorded Temperature Log (#1) from 100' to 45961 , <br /> POOH. RIH and recorded Gamma Ray-Casing Collar <br /> Location Log, POOH. RIH w/ perforating gun, shot four <br /> 11 gram jet shots/ft, 120 deg phasing (0.3111diam, <br /> 18.9" penetration) in following intervals: <br /> Run No. Interval Feet <br /> 1 4565'-4573' 8 <br /> 2 4528'-4538' 10 <br /> 3 4501'-4507' 6 <br /> 4 4495'-4501' 6 <br /> 5 4474'-4495' 21 <br /> 6 4453'-4474' 21 <br /> 7 4432'-4453' 21 <br /> Found sand fill @ 44581 . 30 minutes later, tagged fill <br /> at 44271 . Skipped perforating intended 4411'-4432' <br /> interval. <br /> 8 4390'-4411' 21 <br /> Shut down and secured well. <br /> L-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.