My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
23987
>
2900 - Site Mitigation Program
>
PR0543879
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:57:06 PM
Creation date
10/3/2019 10:47:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0543879
PE
2960
FACILITY_ID
FA0024951
FACILITY_NAME
LODI AIRPORT
STREET_NUMBER
23987
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00517007
CURRENT_STATUS
01
SITE_LOCATION
23987 N HWY 99
P_LOCATION
99
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
223
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
flights . It is estimated by the owner-operator that up to 30 <br /> percent of the airport operations occur on the secondary runway <br /> ( i . e. , 32 , 000 operations per year) . <br /> Future Considerations : <br /> Fixed base aircraft volume has been increasing by 10 to 15 <br /> airplanes per year , which represents an annual growth rate of <br /> approximately nine percent per year . This growth is limited by <br /> the number of hangar spaces available, with 80 new hangar spaces <br /> having been added during the past two years . Consideration is <br /> being given to adding 20 more hangar spaces and an additional <br /> 40 , 000 square feet of shop facilities within the next two years. <br /> The owner-operator expects to add a major fixed base operator to <br /> the facility this year , consisting of a passenger and freight <br /> airline with three Lockheed Electras and four Lear jets . This <br /> operator will also employ up to 70 people . <br /> In order to accommodate this new operation, relocation and <br /> lengthening of the secondary runway will be required. This new <br /> runway will probably be relocated to the west of the present <br /> secondary runway. In conjunction with this facility improvement , <br /> the owner-operator intends to submit an amended airport master <br /> plan to the Airport Land Use Commission for consideration and <br /> adoption. <br /> References • <br /> Cal-Trans, Division of Aeronautics ; Dennis Williams, Aviation <br /> Consultant and Sandy Hesnard, Environmental Planner ; personal <br /> communication. <br /> Kupka, Robert ; Lodi (Lind' s) Airport Owner-Operator ; personal <br /> communication. <br /> Metropolitan Transportation Commission and Association of Bay <br /> Area Governments ; Airport Land Use Planning Handbook; July 1983 . <br /> San Joaquin County Council of Governments (Airport Land Use <br /> Commission) ; Airport Land Use Plan; October 25 , 1983 . <br /> Report prepared by: Bruce Baracco, Associate Planner <br /> Lodi (Lind' s) Airport - 3 - (PC : 3-19-87 ) <br />
The URL can be used to link to this page
Your browser does not support the video tag.