Laserfiche WebLink
Mr Kenneth Earnest <br /> • January 16, 1995 <br /> Page 2 <br /> October 27 to November 30, 1994 <br /> After removing the previously used oxidation system for utilization at another site, no vapor <br /> extraction occurred from October 27 to November 30, 1994, pending installation of a carbon <br /> adsorption system. Therefore, as of November 30, 1994, the cumulative totals remain at 12,752 <br /> pounds for hydrocarbons and 211 pounds for benzene <br /> For this reporting period, the ground water extraction system pumped continuously and extracted <br /> 12,319 gallons from monitoring well MW-3. As of November 30, 1994, the cumulative ground <br /> water extraction total was 131,715 gallons <br /> November 30 to December 16, 1994 <br /> After removing the previously used oxidation system for utilization at another site, no vapor <br /> extraction occurred from November 30 to December 16 1994, pending start-up of a carbon <br /> adsorption system. Therefore, as of December 16, 1994, the cumulative extraction totals remain <br /> at 12,752 pounds for hydrocarbons and 217 pounds for benzene. <br /> • For this reporting period, the ground water extraction system extracted 5,845 gallons from <br /> monitoring well MW-3, bringing the cumulative ground water extraction total to 137,560 <br /> gallons <br /> Enclosure A contains copies of laboratory analytical reports Enclosure B contains copies of <br /> field log sheets. <br /> If you have any questions, please contact either of the undersigned at (916) 939-7550. <br /> Sincerely, <br /> ACTON • MICKELSON • van DAM, INC. <br /> Rod C Goss James C Twiford <br /> Staff Engineer Protect Engineer <br /> RCG JCT•mjd <br /> Enclosures <br /> ACTON- <br /> MICKELSON- Irp=l92 MJ <br /> van DAM,INC <br /> Consulting Scientists,Engineers,and Geologists <br />