Laserfiche WebLink
STI Aboveground Storage Tank Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA <br /> Storage Tank Report 1/21/2014 Tank No.5_Used Antifreeze Weather: Clear moderate <br /> Inspection Goal I Methods Employed <br /> Results <br /> 7,2 DETERMINE ORIGINAL SHELL THICKNESS <br /> 7.2.1 Review original documentation. Not Available <br /> 7.2.2 Consult tank manufacturer. N/A <br /> 7.2.3 Examine tank labels for evidence of widely accepted tank N/A <br /> standard,such as Underwriters Laboratories Standard UL142. <br /> 7.2.4 Measure shell thickness of several areas with no corrosion N/A <br /> 7,3 HORIZONTAL AST Requirements in addition to applicable Items in 7.1: <br /> 7.3.1 Inspect shell plates, Inspect areas accessible without entering AST. Concentrate N/A <br /> welds where corrosion is likely.If significant internal corrosion is <br /> detected,further investigation using Ultrasonic Testing Scans <br /> (UTS)is required. <br /> 7.3.2 Inspect shell Inspect for changes made after AST was fabricated.Record N/A <br /> attachments repads and/or insert plates.Inspect welds for signs of stress <br /> and corrosion. <br /> 7,4 VERTICAL or Requirements in addition to applicable items In 7.1: Vertical AST,Oat on floor <br /> RECTANGULAR AST <br /> 7,41 Inspect shell plates, Inspect areas accessible without entering AST. Concentrate N/A Poly Tank <br /> welds where corrosion is likely.If significant internal corrosion is <br /> detected,further Investigation using UTS is required. <br /> 7.4.2 Inspect shell Inspect for changes made after AST was fabricated. Record N/A <br /> attachments repads and/or insert plates.Inspect welds for signs of stress <br /> and corrosion. <br /> 7.4.3 Vertical AST Roof Inspect for low areas,standing water,paint failure,holes and N/A <br /> corrosion.Take Ultrasonic Thickness Testing(UTr)readings on <br /> roof and record results. If significant Internal corrosion Is <br /> detected,further Investigation using UTS is required. <br /> 7.4.4 DOUBLE WALL& Requirements in addition to applicable items in 7.1: N/A <br /> DOUBLE BOTTOM AST <br /> 7,4,5 Leak Detection Verify that the leak detection equipment method is operating N/A <br /> if the tank Ic in equipped. <br /> 7.4.6 Inspect Interstice Check far leak or liquid in interstice,D-ol vented to N/A <br /> atmosphere. <br /> 7.4.7 Double bottom Double-bottom ASTs require UTT readings of areas that are N/A <br /> single-wall.Double-wall ASTs do not require UTT readings. <br /> 7,5 INSULATED AST Requirements in addition to applicable items in 7.1 to 7.4. N/A <br /> 7,5.1 Remove insulation Remove Insulation in areas where mold or moisture is present N/A <br /> or likely to accumulate and examine metal surface for corrosion. <br /> 7.5.2 Verify damage extent If insulation damage is suspected,remove insulation until WA <br /> extent and nature of corrosion has been established. <br /> 7.5.3 Take LITT readings Take UTT readings on shell and record results. If significant N/A <br /> corrosion is detected,further investigation using UTS Is <br /> required. <br /> 7.5.6 FIELD ERECTED AST Additional requirements for field-erected ASTs are Included in N/A <br /> SP001 Appendix B. <br /> 7,7 FINAL REPORT Include:Field data,measurements,pictures,drawings,tables Dated 1/21/14 Re-inspect <br /> and an inspection summary,Identify unacceptable conditions In S years oras specified in <br /> and recommended corrective actions.Determine the SPCCP or hazardous waste <br /> suitability for continued service.Include the next scheduled regulations <br /> formal external or internal inspection as applicable.Include <br /> inspector's name and certification number in the report <br />