STI Aboveground SEGoal
<br /> nk Report Formal External Inspection COVEY AUTO EXPRESS,Stockton,CA
<br /> Storage Tank Repo /2014 Tank No.5_200 GA Poly Vertical Cylindrical-Used Antifreeze
<br /> InspectioMethods Employed Results
<br /> 7,1 GENERAL
<br /> 7.1.1 Formal External Certification Name and Number Daniel K. Barber
<br /> Inspection is to be
<br /> STI Certified
<br /> certified Inspector performed Level 11 AST SAC 18709
<br /> 7.1.2 Applicable Check List Horizontal and Vertical Cylindrical Single Wall,Steel See Below for each AST
<br /> Horizontal Rectangular Double Wall,Steel Photos attached
<br /> Containment&Accessories-Visual,Ultrasonic Thickness
<br /> Testing ft n-r' History.
<br /> 7.1.3 Review History Interview long time employees Inspection and Drain Release Discuss with Mike Covey,Jr.
<br /> Records. Truck Shop Management
<br /> 7.1.4A Record AST Locate Plate,-Manufacturer,Date,Design Standard.Serial 7200'GA, Poly Vertical
<br /> Nameplate Data No. Cylindrical 2.9'diameterx
<br /> Capacity,shell thickness,diameter,length 4.5'tall
<br /> 7.1.46 Record Inspection Apply Visual,Ultrasonic&other methods,Photograph and OK
<br /> Findings&Problems Record findings.
<br /> 7.1.5 inspect Fabrication Compare to UL,SWI,STI or other industry standards, OK
<br /> vs.Industry Standards modifications to original AST.
<br /> 7.1.6 Verify Foundation Visual examination for concrete cracking,spalling,washout, Sound PCC Shop
<br /> Integrity voids,settling,slope from AST,standing water,soil contact, Containment floor
<br /> seepage.
<br /> 7,1,7 Visually Inspect Cracking or spalling,corrosion,anchorage,weld failure or OK
<br /> Supports stress,saddle pads.
<br /> Visually Inspect Visual examination for cracking,spalling,welds, Shop Floor Barrier,no
<br /> Secondary containment,penetrations,other containers,basis of secondary container
<br /> Containment,Spill volume calculations,drain valves dosed&secured,debris
<br /> Control&CRDM free,& personnel access.
<br /> Containment ID
<br /> 7,1,9A Inspect Ancillary Inspect operability of pumps,valves and piping for stress, N/A
<br /> Equipment-Pumps leakage,fusible links,for corrosion,wiring conduit integrity.
<br /> Fill point containment,Camlock connectors
<br /> 7,1,98 Inspect Ancillary Inspect operability of emergency relief&normal venting, None
<br /> Equipment-Vents continuity of vapor containment
<br /> 7.1.9C Inspection Ports Interstitial n/a Verify no leakage Into secondary interstitial N/A
<br /> 7.1.9D Inspect Ancillary No level gauge Translucent opaque AST,
<br /> Equipment-Liquid content level readily
<br /> Level visible
<br /> 7.1.9E Inspect Alarms Overfill Alarm Only none on secondary interstitial volume No alarm
<br /> 7.1.10 Inspect Bonding and Refer to NFPA 780 Standards for Installation of Lightning N/A
<br /> Grounding,if present Protection Systems.
<br /> 7.1.11 Inspect Stairways, Inspect for broken welds,bent members,corrosion,debris N/A
<br /> Handrails&Platforms free.
<br /> 7.1.12 Inspect Coatings& Exterior of shell,heads,supports and interference with Trinity Antifreeze
<br /> Labels equipment,Signage.