My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1444
>
2200 - Hazardous Waste Program
>
PR0535125
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/26/2024 4:33:23 PM
Creation date
10/9/2019 9:26:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535125
PE
2227
FACILITY_ID
FA0016178
FACILITY_NAME
URS MIDWEST INC DBA UNITED ROAD
STREET_NUMBER
1444
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
11736030
CURRENT_STATUS
01
SITE_LOCATION
1444 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\dsedra
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAZARDOUS W <br />For use by Unidocs Member <br />Authority Cited: Title 22, California Code of Reg <br />NTINGENCY PLAN <br />�yhere approved by your Local Jurisdiction <br />R) ,$66265.52 as referenced by §66262.34(a)(4) or 67450.3(c)(9)(C) <br />Facilities that generate 1,000 kilograms ar morwTiazat <br />kilograms of hazardous waste on-site at any one"t"ime, <br />in any month more than I kilogram of acutely nFelcy <br />11 <br />resulting from the spill of an AHW, or whi a2 <br />onsite treatment tier must also prepare a Con <br />Contingency Plan are already subject to Hazardous Ma <br />due to the quantities of hazardous materials/wastes they <br />lopaste per month, or accumulate more than 6,000 <br />are a Contingency Plan. Facilities that generate <br />aste (AHW), or more than 100 kilograms of debris <br />trdous waste onsite under the Permit by Rule (PBR) <br />Plan. Many facilities that are required to prepare a <br />erials Business Plan (HMBP) reporting requirements <br />have onsite. If you have alreadv prepared a Unidocs <br />This site-specific Contingency Plan is the facility's plan for dealing with emergencies and shall be implemented <br />immediately whenever there is an imminent or actual fire, explosion, or release of hazardous waste or a <br />hazardous waste constituent which could threaten human health and/or the environment. At least one copy of <br />the plan shall be maintained at the facility for use in the event of an emergency and for inspection by the <br />local agency. A copy of the plan and any revisions must be provided to any contractor, hospital, or agency <br />with whom special (i.e. contractual) emergency services arrangements have been made (see Section E, below). <br />A. Facility Information: <br />B. Emergency Coordinators: <br />All personnel qualified to act as the facility's Emergency Coordinator must be listed in this plan. (Note: <br />Emergency Coordinator responsibilities are described in Section F, below.) If more than two people are <br />qualified, list the names, titles, business and 24-hour telephone numbers, and pager numbers of the additional <br />qualified individuals on an attached page in the order in which they will assume responsibility as alternates, <br />then check the box beneath the Emergency Coordinator information table, below, and indicate the list's page <br />number in the space provided. <br />Primary EmergencX Coordinator <br />Secondary Emergency Coordinator <br />NAME <br />NAME <br />Mike Covey, Jr. <br />Tony Garrett <br />TITLE <br />TITLE <br />Manager <br />Shop Foreman <br />BUSINESS PHONE <br />BUSINESS PHONE <br />209 464-0016 <br />209 464-0016 <br />24-HOUR PHONE <br />24-HOUR PHONE <br />(209) 9934298 <br />(209) 993-0904 <br />PAGER# <br />( ) <br />PAGER# <br />( <br />❑ (Check box only if applicable) Additional Emergency Coordinators are listed on page of this plan. <br />C. Evacuation Plan: <br />1. The following alarm signal(s) will be used to begin evacuation of the facility (check all that apply): <br />❑ Bells; ❑ Homs/Sirens; ® Verbal (i.e., shouting); Z Other (specify Public Address System <br />IJN-017 -1/6 www.unidocs.org Rev. 03/27/08 <br />
The URL can be used to link to this page
Your browser does not support the video tag.