Laserfiche WebLink
D. Results of Testing/Servicing <br />Software Version Installed <br />Complete the following checklist: <br />329.01 <br />RECEIVED <br />FEB 0 8 2016 <br />® Yes <br />s the audible alarm operational? IT <br />® Yes <br />s the visual alarm operational? <br />® Yes <br />F <br />Were all sensors visually inspected, functionally tested, and confirmed operational? <br />Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will not interfere with their proper <br />® Yes <br />operation?❑ <br />Yes <br />f alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem) operational? <br />® N/A <br />❑ No" <br />For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment monitoring system detects a leak, <br />initiate positive shut -down? (Check all that apply) ®Sump/Trench <br />® Yes <br />❑ N/A <br />fails to operate, or is electrically disconnected? If yes: which sensors <br />Sensors; ® Dispenser Containment Sensors. <br />Did you confirm positive shut -down due to leaks and sensor failure/disconnection? ® Yes; ❑ No. <br />C3 Yes <br />❑ No- <br />For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no mechanical overfill prevention valve is <br />operating properly? If so, at what percent of tank capacity <br />® N/A <br />installed), is the overfill warning alarm visible and audible at the tank fill point(s) and <br />C3 Yes <br />® No <br />does the alarm trigger? <br />Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment replaced and list the manufacturer name <br />and model for all replacement parts in Section E, below. <br />❑Yes• <br />® No <br />Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply) <br />❑ Product; ❑ Water. If yes, describe causes in Section E. below. <br />® Yes <br />El No* <br />Was monitoring system set-up reviewed to ensure proper settings? Attach set up reports, if applicable <br />® Yes <br />I❑ No* <br />Is all monitoring equipment operational per manufacturer's specifications? <br />' In Section E below, describe how and when these deficiencies were or will be corrected. <br />E. Comments: <br />rNlCn -1 ') Arlin zst TI IL2AI nM R7 FART Tl IRRINE <br />DISP 3-4 AND "TURN ON 87 WEST TURBINE <br />INSTALLED NEW BATTERY <br />Monitoring System Certification Page 2 of 4 2/21/07 <br />win <br />