My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2016 - 2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4747
>
2300 - Underground Storage Tank Program
>
PR0232482
>
COMPLIANCE INFO 2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2019 3:44:53 PM
Creation date
10/9/2019 1:31:00 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0232482
PE
2361
FACILITY_ID
FA0003719
FACILITY_NAME
WEST LANE CHEVRON
STREET_NUMBER
4747
STREET_NAME
WEST
STREET_TYPE
LN
City
STOCKTON
Zip
95210
APN
10437010
CURRENT_STATUS
01
SITE_LOCATION
4747 WEST LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
126
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In -Tank Gauging / SIR Equipment: ® Check this box if tank gauging is used only for inven I <br />(; __ <br />❑ Check this box if no tank gauging or SIR equipment i 1 <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />TTS'' p <br />Complete the following checklist: FEB U 2nig <br />® Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />® Yes <br />❑ <br />❑ <br />No* <br />No' <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Ni��lr <br />Was accuracy of system product level readings tested? <br />® Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />® Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />® Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br />• In u h.1— a— Ak- k-. ..... _ .�---�-°---°-- --- -- <br />u unto u1COO YCIICMIUMb WVFtr Vf will ue GOr <br />Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />® Yes <br />® Y <br />❑ No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? (Check all that apply) <br />❑ N/A <br />Simulated leak rate: ® 3 g.p.h.; ❑ 0.1 g.p.h; ❑ 0.2 g.p.h. <br />® Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />® Yes <br />❑ No' <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />® N/A <br />® Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />® Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />❑ N/A <br />Yes <br />❑ No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />❑ N/A <br />® Yes <br />❑ No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ N/A <br />es ❑ No Were all items on the equipment manufacturer's maintenance checklist completed? <br />' In Section H, below, describe how and when these deficiencies were or will be corrected. <br />H. Comments <br />Monitoring System Certification Page 3 of 4 2/21/07 <br />NTAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.