My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
2185
>
2300 - Underground Storage Tank Program
>
PR0231118
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2019 3:52:53 PM
Creation date
10/21/2019 3:25:41 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231118
PE
2371
FACILITY_ID
FA0003284
FACILITY_NAME
FOOD MART GASOLINE*
STREET_NUMBER
2185
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14113045
CURRENT_STATUS
01
SITE_LOCATION
2185 E FREMONT ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQ'I._ .COUNTY EN-vIRONI IENT-4LIfEALTH D..._-_RTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-PAGE 1 <br /> TYPE OF ACTION ❑ 1.NEW PLAN C<2 CHANGE OF INFORMATION M.H. <br /> PLAN TYPE 0 MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLowrNG UST SY STEm(S): <br /> I. FACILITY I �FORVIATION <br /> FACILITY ID 9(Agency Use Onhv <br /> FACILITY NAME ')§ M03. <br /> d <br /> FACILITY SITE ADDRESS SS 6-t--nnoo+ - tiQ; otos. <br /> II. EQUIPMENT TESTING`AND`PREVE ITIVE 11AI tTE\A�NCE <br /> State law requires that testing.preventive maintenance,and calibration of monitoring equipment(e.g..sensors.probes.line leak detectors..etc.)be performed in Nto6. <br /> accordance with the equipment manufacturers'instructions,or annually.whichever is more frequent Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY ❑ 99.OTHER(Specify): Nur'_ <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). Ifyou already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form.Hazardous Materials Business Plan map.etc)which shows all required information-include it with this plan. <br /> TA1'K MONTfORItG <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S).(Check all that appt}-) Ntt� <br /> I.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: fO a.DRY Q ❑ ❑ d.UNDER VACUUM Nil1. <br /> ` i _.,t❑�b.LIQUID FILLED c.UNDER PRESSURE <br /> PANEL MANUFACTURER: V 'C_.If�l'� �- art' MODEL r: -T L-S '�SS17 Nita. <br /> LEAK SENSOR MANUFACTURER: 111 1 Ntt4. MODEL 9(S): --791A32Q--Lic--)Q Nil-` <br /> ❑ 2.AU'T'OMATIC TANK GAUGING(ATG)SYSTEM USED TOT ONITOR SINGLE WALL TAN'K(S) <br /> PANEL MANUFACTURER: MODEL : MI <br /> IN-TANX PROBE MANUFACTURER: Nttg. MODEL 4(S): Ni19. <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS ❑ b.DAILY:NIGHTLY ❑ c.)WEEKLY Nrzo- <br /> ❑ d.MONTHLY ❑ e.OTHER(SpeeiR): '40t. <br /> PROGRAMMED TESTS: ❑ a.0.1 g.p.h. ❑ b.0.2 g.p.h. ❑ c.OTHER(Specify): N@Z Nt23. <br /> ❑ 3.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Na'4 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(\FFG)PER 23 CCR§§2645 <br /> TESTING PERIOD: ❑ a.36 HOURS ❑ b.60 HOURS Nr=� <br /> 5.INTEGRITY TESTING PER 23 CCR$2643.1 <br /> TEST FREQUENCY: R] a.ANNUALLY ❑ b.BIENNIALLY ❑ c.OTHER(Specift-): N¢6. NC.. <br /> 6.VISUAL MONITORING DONE: ® a.DAILY ❑ b.WEEKLY iR <br /> ^rEnres aaan�y appnr•al <br /> ❑ 99.OILIER(Specify): <br /> V. PIPE MO'_!'ITQRING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> 1.CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> SECONDARY CONTAINMENT IS: ® a/.DRY" ❑ b.LIQUID FILLED ❑ c UNDER PRESSURE ❑ d.UNDER VACUUM NU"1. <br /> PANEL ALANUFACTURER %/�6e-r c,)4- 'L` MODEL#: 1 LS- M33- <br /> LEAK SENSOR N,IAN FACTU'RER: "cLC'' .5.. Nc; A40DEL-1(S): N135. <br /> WILL A PIPING LEAK ALAP-X1 TRIGGER AUTOMA C PUMP(i.e,TURBINE)SHUTDOWN? ❑ a.YES ❑ b.NO Nti6' <br /> WILL EAILUREDISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO 113'. <br /> 2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW 1173EN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s):_ ►--C _ }l�d Nr3s. MODEL 4(S): N139 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANLTFACTTRER: Nr40. MODEL Nr41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUAM MONTHLY 0.2 g.p.h_ ❑ b.14IINI-WiM ANNUAL 0.1 e.p.h. Nr4z. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO Nr43. <br /> WILL ELLD FAILURE.'DISCONINECTTON TRIGGER AUTOMATIC PUNIP SHUTDOWN? ❑ a.YES ❑ b.NO N144. <br /> [� 4.INTEGRITY TESTING <br /> TEST FREQUENCY: a.ANNUALLY Ni4s. Ni46. <br /> ❑ b.EVERY 3 YEARS ❑ c OTHER(Specify) <br /> ® 5NISC?AL MONITORING DONE: a.DAILY ❑ b.WEEKLY* ❑ c\ffN.MONTHL.Y c EACH TIME SYSTEM OPERATED- A14'. <br /> •ReTuires agenaapproval -Allowod for meniw ine efunbune r rncmcnc pa a j<or firl pining ouh,pas HSC Vr5'A1.5kb;K3) <br /> ® 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> (� 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> ❑ 99,OTHER(Specifi) N14e. <br /> SJCERD-d(07/03)-114 07/23/03 <br />
The URL can be used to link to this page
Your browser does not support the video tag.