My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARLAN
>
17100
>
2900 - Site Mitigation Program
>
PR0524092
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2019 10:35:45 AM
Creation date
10/29/2019 10:34:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524092
PE
2965
FACILITY_ID
FA0016185
FACILITY_NAME
CARPENTER CO
STREET_NUMBER
17100
Direction
S
STREET_NAME
HARLAN
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19812004
CURRENT_STATUS
01
SITE_LOCATION
17100 S HARLAN RD
P_LOCATION
03
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring Well Requirements - 3 - <br /> Topographic map showing facility location, roads, surface water bodies <br /> Scaled site map showing all previously existing wells, newly installed wells, surface water <br /> bodies, buildings, waste handling facilities,utilities, and other major physical and man-made <br /> features. <br /> B. Drilling Details (in narrative and/or graphic form): <br /> On-site supervision of drilling and well installation activities <br /> Drilling contractor and driller's name <br /> Description of drilling equipment and techniques <br /> Equipment decontamination procedures <br /> Soil sampling intervals and logging methods <br /> Well boring log <br /> - Well boring number and date drilled <br /> - Borehole diameter and total depth <br /> - Total depth of open hole (same as total depth drilled if no caving or back-grouting <br /> occurs) <br /> - Depth to first encountered groundwater and stabilized ground ater depth <br /> - Detailed description of soils encountered, using the Unified Soil Classification System <br /> C. Well Construction Details (in narrative and/or graphic form): <br /> Well construction diagram, including: <br /> - Monitoring well number and date constructed <br /> - Casing and screen material, diameter, and centralizer spacing(if needed) <br /> - Length of well casing, and length and position of perforated interval <br /> - Thickness,position and composition of surface seal, sanitary seal, and sand pack <br /> - Type of well caps (bottom cap either screw on or secured with stainless steel screws) <br /> E. Well Development: <br /> Date(s) and method of development <br /> How well development completion was determined <br /> Volume of water purged from well and method of development water disposal <br /> Field notes from well development should be included in report <br /> F. Well Survey (survey the top rim of the well casing with the cap removed): <br /> Identify the coordinate system and datum for survey measurements <br /> Describe the measuring points (i.e. ground surface,top of casing, etc.) <br /> Present the well survey report data in a table <br /> Include the Registered Engineer or Licensed Surveyor's report and field notes in appendix <br /> Sacramento Non 15 Unit:updated 3 March 2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.