Laserfiche WebLink
rs✓ -.11 <br /> 05/24/89 Inter-office memo from Virginia Cahill to Stuart Somach (MH&A) regarding the <br /> SJLHD confusion between the two sites. Even after distinguishing the two sites, <br /> RWQCB still needed to approve work at both sites. <br /> 06/06/89 Letter from Stuart Somach (MH&A) to Bob Hamel (Teichert) with copy of memo <br /> dated 05/24/89. S.S. says that. he feels that an investigation should be started. <br /> If there is a contamination problem, he wants to have LPC where he can get his <br /> "hands on them." There's a hand written note that on "06/17/89, told SS to go <br /> ahead, RHH. <br /> 06/08/89 Letter to Bob Hamel (Teichert) from Virginia Cahill (MH&A) detailing her <br /> conversation with Robert Evans (RWQCB) regarding the Board's request for <br /> Report of Waste Discharge on 01/18/89. After LPC's letter to RWQCB, the <br /> Board did not respond in writing. In the conversation V.C. had with R.E., he <br /> said the Board decided not to require anything further at the time, but may <br /> address the matter in the future. <br /> 06/21/89 Letter to Gary Reents (RWQCB) from Virginia Cahill (MH&A) explaining the <br /> situation with the two sites and that SJLHD requires the board's approval for the <br /> two wells related to the pickle factory. <br /> 07/12/89 Letter to Virginia Cahill (MH&A) from Gary Reents (RWQCB) with comments <br /> on workplan to install two monitoring wells. Reents questioned 1) Why dual <br /> completion when screen intervals are only 5 ft apart?; and 2) Is there enough info <br /> on MW4 and MW5 to determine that they are "background"? Suggested <br /> containment of all purgewater instead of discharging to the sewer "unless there <br /> is'some indication of the presence of hydrocarbons or other hazardous material." <br /> Recommended continuous sampling during drilling. Stated that the results must <br /> be submitted to RWQCB. <br /> 08/11/89 Letter to James Elder (LBME) from Gary Reents (RWQCB) with more comments <br /> on gradient direction and background levels. <br /> 12/20/89 Draft Preliminary Investigation Report by LBME Corp. <br /> 03/19/90 Letter to Patricia Leary (RWQCB) from LBME giving preliminary results of soil <br /> and groundwater analyses after installing MW7 and MW8. <br /> 08/24/93 Notice of Violation to Michael Strongin (LPC) from Morris Allen (City of <br /> Stockton, Dept. of Municipal Utilities). During the month of July, LPC <br /> discharged wastewater containing 17,563 pounds of biochemical oxygen demand <br /> (BOD) and 6295 ppm total suspended solids (TSS), while the limits are 13,000 <br /> pounds/month and 1000 ppm, respectively. LPC was ordered to submit details <br /> regarding the cause of the violations and the corrective actions taken or planned. <br /> gro=d=ktcichcd\sitchist 6 <br />