Laserfiche WebLink
Exclusion zone Direct excavation A B C D Other <br /> Reduction zone Collect and Qreserve soil samples; A B C D Other <br /> monitor excavating <br /> Support zone Support functions A B C D Other <br /> Specific protective equipment for each level of protection used is follows: <br /> Level D hard hat <br /> steel-toed boots <br /> half faced resp. (if n_ ec.) <br /> gloves <br /> safety glasses <br /> If air purifying respirators are authorized,-organic vaRor and dust is the appropriate canister <br /> for use with the involved substances and concentrations. <br /> No changes of the specified levels of protection shall be made without the approval of the <br /> site safety officer and the project team leader. <br /> F. ONSITE WORK PLANS _ <br /> Work party(ies) consisting of two persons will perform the follovdng tasks: <br /> Project <br /> Team Leader : Robert Marty log borings, <br /> preserve samples <br /> Work Party #1 Geologist direct excavation <br /> Excavator Operator collect samples <br /> The works party(ies) were briefed on the content of this.plan at <br /> the site on <br /> C�bSimi Aust Seri; 1- 3 <br /> Site H-M R Way%.'nS-S <br />