Laserfiche WebLink
E: <br /> ri <br /> Problem Assessment Report Page 2 <br /> 204 East Lodi Ave <br /> The PAR indicated that the preferred groundwater remediation alternative was air sparge. Currently,there <br /> are no wells which are suitable for air sparging. Therefore,the final remediation plan should include as part <br /> of the work plan details regarding the installation of air sparging wells and additional extraction wells should <br /> they be deemed necessary. <br /> Quarterly monitoring and sampling of the monitoring wells should continue to monitor the effectiveness of <br /> them't � atment system. <br /> Please proceed with efforts to obtain an authority to construct permit from the San Joaquin Valley Unified <br /> Air Pollution Control District to initiate operation of the preferred remedial treatment methods: vapor <br /> extraction and air sparge. <br /> Please submit by May 16, 1994 a draft final remediation plan along with an executive summary. PHSIEHD <br /> will then initiate a public participation period to obtain-and,,evaluate any comments which may be submitted. <br /> If you have any questions,comments or wish to schedule a site inspection,please contact Mary Ways,Senior <br /> RENS, of my staff at (209) 468-0337. <br /> Earnest Fujimoto, M.D.,M.P.H. <br /> Acting Health Officer <br /> Diane M.Hinson, Supervising R.E.H.S. <br /> Environmental Health Division <br /> DMHJ VEE <br /> }! Elizabeth Thayer, CVRWQCB <br /> James De Mera <br /> Albert EWs <br /> Bob Marty, Geological Audit <br /> A <br /> .i <br />