My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
3500 - Local Oversight Program
>
PR0544962
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:39:27 AM
Creation date
11/6/2019 9:15:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544962
PE
3528
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jim Thorpe Oil, Inc. 2 June 19, 1991 <br /> Estimated <br /> A detailed description of the estimated costs for one, quarter of groundwater <br /> monitoring is presented below: <br /> -Health) and Safety Plan Preparation (one time): <br /> Staff geologist/engineer...............................................4 hours x $70.00/hr = $280.00 <br /> .Groundwater measurements, purging and sampling of three monitoring wells: <br /> Assistant geologist............................................................8 hour,x $65.00/hr - $520.00 <br /> -Laboratory Analysis: <br /> TPPH and BTX&E by EPA Test Method 8240...................3 x '$161.00/sample = $483.00 <br /> -Data analysis and report preparation including conclusions and recommendations: <br /> Staff Geologist........................................................... 10 hours x $70.00/hour = $700.00 <br /> Technical review (Project Geologist).....................2 hours x $80.00/hour = $160.00 <br /> Draftsperson...............................:................................ 6 hours x $50.00/hour = $300.00 <br /> Copying, binding and distribution (Clerical Staff)..........2 hours x $35.00 = $70.00 <br /> .Project Management...................................................................................................... $500.00 <br /> •Equipment rentals and supplies.................................................................................. $300.00 <br /> ........:...$3,313.-'00: <br /> .......:.. $ Y3 00 <br /> .. ,Total Cost...................................................................... <br /> ..: : 3;3 <br /> .s <br /> Schedule and Condilions, <br /> 1W expect that work on the project can begin immediately following <br /> authorization, with the report available within 10 to 15 working days after the <br /> receipt of laboratory results. This fee quotation will remain in effect for 90 days. <br /> li Should' unforeseeable site conditions require a different approach or additional work, <br /> this estimate may need to be revised. We would notify the Client of any major change <br /> in they proposed scope of .work prior to initiating such a change. Fees for additional <br />
The URL can be used to link to this page
Your browser does not support the video tag.