My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
3500 - Local Oversight Program
>
PR0544962
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:39:27 AM
Creation date
11/6/2019 9:15:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544962
PE
3528
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Ifs <br /> 2 June 19, 1991 <br /> flim Thorpe Oil, Inc. <br /> Eslim'ated Costs <br /> A detailed description of the estimated costs for one quarter of groundwater <br /> monitoring is presented below: <br /> •Health and Safety Plan Preparation (one time): <br /> Staff geologist/engineer................ ...........4 hours x $70.00/hr = $280.00 <br /> ' <br /> -Groundwater measurements,' purging `arid sampling of 'three`:'monitoring wells: <br /> Assistant geologist.............................. .........................8 hour x $65.00/hr = $520.00 <br /> -Laboratory Analysis: <br /> TPPH and BTX&E .by EPA Test Method 8240...................3 x $161.00/sample = $483.00 <br /> •Data analysis and report preparation including conclusions and recommendations: <br /> Staff Geologist........................................................... 10 hours x $70.00/hour = $700.00 <br /> Technical review (Project Geologist).....................2 hours x $80.00/hour = $160.00 <br /> Draftsperson.............:.................:............................... 6 hours x $50.00/hour = $300.00 <br /> Copying, binding and distribution (Clerical Staff)..........2 hours x $35.00 = $70.00 <br /> -Project Management........................................ ............................:............................._.. $500.00 <br /> -Equipment rentals and .supplies................................. ............................................. $300.00 <br /> •Tota! Cost.................................................................:....................$3,313.00 <br /> Schedule and Conditinnx <br /> We expect that work on the project can begin immediately following <br /> authorization, with the report available within 10 to 15 working days after, the <br /> recei;pt of laboratory results. This fee quotation will remain in effect for 90 .days. <br /> Should unforeseeable site conditions require a different approach or additional work, <br /> this ;estimate may need to be revised. We would. notify the Client of any major change <br /> in the proposed scope of work prior to initiating such a change. Fees for additional <br />
The URL can be used to link to this page
Your browser does not support the video tag.