My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LODI
>
204
>
3500 - Local Oversight Program
>
PR0544962
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:39:27 AM
Creation date
11/6/2019 9:15:21 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544962
PE
3528
FACILITY_ID
FA0003651
FACILITY_NAME
ARTS & ARTISTS
STREET_NUMBER
204
Direction
E
STREET_NAME
LODI
STREET_TYPE
AVE
City
LODI
Zip
95240
APN
04719102
CURRENT_STATUS
02
SITE_LOCATION
204 E LODI AVE
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
tir. y <br /> 28 February 1997 <br /> AGE-NC Project No. 95-0112 <br /> Page 2 of 2 <br /> a draft report. The report will include mass balance calculations for petroleum hydrocarbons <br /> in soil. Final reporting will be included in the Quarterly Report -April 1997. <br /> 4. Modeling will be performed to determine what risk, if any, remaining hydrocarbons in the <br /> vadose zone pose to ground water. <br /> 5. A revised laboratory report for soil samples collected during the July 1996 probing event has <br /> been issued by the laboratory. The revised report, requested QA/QC data sheets and <br /> chromatograms are included in the Quarterly Report-January 1997. The revised data will <br /> be incorporated with soil data tabulated for the draft report. <br /> 6. QA/QC data sheets for water samples collected in July and October 1996 will be included <br /> in the Quarterly Report -January 1997. <br /> 7. On 07 February 1997, operation of the in-situ air sparging unit was discontinued. Operation <br /> of the vapor extraction system was continued until 26 February 1997. <br /> 8. Due to the low concentrations of extracted hydrocarbons, agreement was reached between <br /> the PHS-EHD and AGE to discontinue use of the 1C engine vapor extraction unit. The use <br /> of a regenerative blower/carbon canister systein was discussed. The necessity and cost <br /> effectiveness of installation of a blower/carbon unit will be evaluated after analytical data <br /> from the 26 February 1997 assessment is available. <br /> 9. The advancement of one additional probing, most likely located south of MW-1, was <br /> discussed. However, the necessity ;uid actual location for this probing will be evaluated after <br /> analytical results of soil samples collected during the February 1997 probing have been <br /> reviewed. <br /> If you have any questions or require further information.please contact our office at(209) 956-0264. <br /> U11-1c,:rcly, <br /> Advanced GeoEnvironmental, Inc. <br /> Kevin McKibben <br /> Senior Staff Geologist <br /> cc: Ms. Mary Lehr <br /> Mr. Jarnes DeMera, Esq. - Mullen, Sullivan &Newton <br />
The URL can be used to link to this page
Your browser does not support the video tag.