My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WALNUT
>
102
>
2900 - Site Mitigation Program
>
PR0544963
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2019 9:37:47 AM
Creation date
11/6/2019 9:37:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0544963
PE
2952
FACILITY_ID
FA0005498
FACILITY_NAME
MATHESON LODI YARD
STREET_NUMBER
102
Direction
E
STREET_NAME
WALNUT
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
102 E WALNUT ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
activities progress , addenda to this plan will be provided <br /> by Roger Foott Associates , Inc . <br /> AUTHORITY FOR SITE SAFETY <br /> Roger Foott Associates , Inc . personnel responsible for <br /> the project safety are. the Project Manager and the field <br /> geologist . The Health and Safety Coordinator is responsible <br /> for the overall Health and Safety Program of Roger Foott <br /> Associates , Inc . , and may choose to audit any site for <br /> compliance and take appropriate action to correct <br /> deficiencies . The Project Manage is responsible . for <br /> implementing the provisions of th s Plan, providing a copy , <br /> of this Plan to the field personn 1 , and advising personnel <br /> used on health and safety matters . The Project Manager and <br /> field geologist have the authority to audit site activities <br /> for compliance with the provisions of this Pian and may <br /> suspend or modify work practices or dismiss subcontractors <br /> whose conduct does not: meet the requirements specified in <br /> this Plan. <br /> The Project Manager and field geologist are responsible <br /> for the dissemination of the information contained in this <br /> Plan to Roger Foott Associates , Inc . , personnel assigned to <br /> the project and to the responsible representative of each <br /> subcontractor firm working under Roger Foott Associates , <br /> Inc : , on the project . The field geologist will act as the <br /> Site Safety Officer . As such, the field geologist is <br /> responsible for adequately addressing the following items : <br /> • Safety supplies and eq ipment inventory onsite <br /> • Training programs and ha7ard communication <br /> • Procedures for reporting accidents or incidents <br /> • Decontamination and contamination-reduction <br /> procedures <br /> ROGER FOOTT ASSOC IATES, INC. <br />
The URL can be used to link to this page
Your browser does not support the video tag.