My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PINE
>
212
>
2900 - Site Mitigation Program
>
PR0506145
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 11:00:07 AM
Creation date
11/12/2019 10:31:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0506145
PE
2950
FACILITY_ID
FA0007226
FACILITY_NAME
BECKMAN BUILDING
STREET_NUMBER
212
Direction
W
STREET_NAME
PINE
STREET_TYPE
ST
City
LODI
Zip
95241
APN
04303203
CURRENT_STATUS
01
SITE_LOCATION
212 W PINE ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kennedy/Jenks Consultants <br /> PRIVILEGED & CONFIDENTIAL <br /> 6.0 STANDARD OF CARE <br /> This Soil Gas Survey Report (Report) has been prepared for the City of Lodi by <br /> Kennedy/Jenks Consultants to present the results of a soil gas survey at the Beckman <br /> Building property, located at 212 W. Pine Street in Lodi, Califomia. The objective of the <br /> soil gas survey was to gather data on the possible presence of perch loroethylene within <br /> soils in the vicinity of and immediately underlying the Beckman Building. The Report has <br /> been prepared by Kennedy/Jenks Consultants in accordance with currently acceptable <br /> engineering practices and is based on information currently available to Kennedy/Jenks <br /> Consultants regarding the Beckman Building. The objectives of the soil gas survey are <br /> limited to those stated in the Report and no other warranty is implied or extended. The <br /> Report has been prepared under the direction of a Califomia Registered Civil Engineer. <br /> KENNEDY/JENK ON I TANTS <br /> James G. Curtis, P.E. NO. C ^�- <br /> �. <br /> Project Manager Il rXp. c <br /> � 1 <br /> 4f2gfg-5 7:13?M 7 952704.01 <br /> ;:40c 119 -L9527Cs.C.40di-rpt d« <br />
The URL can be used to link to this page
Your browser does not support the video tag.