Laserfiche WebLink
Soil Sampling Workplan <br /> Former Manufactured Gas Plant—Lodi,California <br /> 6.0 REPORTING AND SCHEDULE <br /> 6.1 REPORTING <br /> Following completion of the sampling and testing activities proposed, the data will be compiled and <br /> incorporated into the pre-design and planning activities of the project. The data will additionally be <br /> summarized and presented in a Technical Memorandum. <br /> 6.2 SCHEDULE <br /> The proposed sampling activities will completed within four to eight weeks of receiving Workplan <br /> approval. <br /> TERRA PACIFIC GROUP Page 14 October 19, 2012 <br />