Laserfiche WebLink
Soil Sampling Workplan <br /> Former Manufactured Gas Plant—Lodi,California <br /> 7.0 REFERENCES <br /> Stantec, 2008, Remedial Investigation Workplan, Former Lodi Manufactured Gas Plant, 712 South <br /> Sacramento Street,Lodi,California,August 7. <br /> Stantec, 2010a, Remedial Investigation Completion Report, Former Lodi Manufactured Gas Plant, 712 <br /> South Sacramento Street,Lodi,California,June 8. <br /> Stantec, 2010b, Results of Soil Vapor Pilot Testing,Letter report to Robert Aragon,DTSC, prepared by <br /> Stantec, RE: Pacific Gas and Electric Company Former Lodi Manufactured Gas Plant, 712 <br /> South Sacramento Street,Lodi,California,October 29. <br /> Stantec, 2011a, Revised Remedial Refinement Investigation Report, Former Lodi Manufactured Gas Plant, <br /> 712 South Sacramento Street,Lodi,California,March 8. <br /> Stantec, 2011b, Draft Final Human Healtb Risk Assessment/Feasibility Study/Removal Action Workplan, <br /> Former Lodi Manufactured Gas Plant, 712 South Sacramento Street, Lodi, California, <br /> September 1. <br /> TERRA PACIFIC GROUP Page 15 October 19, 2012 <br />