My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
712
>
2900 - Site Mitigation Program
>
PR0528086
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 1:48:13 PM
Creation date
11/12/2019 1:37:25 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528086
PE
2959
FACILITY_ID
FA0019017
FACILITY_NAME
FORMER LODI MGP
STREET_NUMBER
712
Direction
S
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04532006
CURRENT_STATUS
01
SITE_LOCATION
712 S SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pre-Design Investigation Workplan <br /> Former Manufactured Gas Plant— Lodi, California <br /> TABLE OF CONTENTS <br /> Page <br /> LISTOF TABLES.........................................................................................................................................Ili <br /> LISTOF FIGURES.......................................................................................................................................III <br /> LISTOF APPENDICES................................................................................................................................III <br /> LIST OF ACRONYMS AND ABBREVIATIONS...........................................................................................iv <br /> ACKNOWLEDGMENT AND SIGNATURE PAGE........................................................................................v <br /> 1.0 INTRODUCTION..............................................................................................................................1 <br /> 2.0 BACKGROUND...............................................................................................................................2 <br /> 2.1 SITE LOCATION AND DESCRIPTION...................................................................................................2 <br /> 2.2 SITE HISTORY................................................................................................................................2 <br /> 2.3 SITE GEOLOGY...............................................................................................................................3 <br /> 2.4 SITE HYDROGEOLOGY.....................................................................................................................4 <br /> 2.5 SUMMARY OF PREVIOUS INVESTIGATIONS, REMEDIAL ACTIONS AND DEED RESTRICTIONS....................4 <br /> 2.5.1 Site Screening Investigation (1985).........................................................................................4 <br /> 2.5.2 Surface Soil Sampling (2006)..................................................................................................5 <br /> 2.5.3 Cultural Resources Survey(2007)...........................................................................................5 <br /> 2.5.4 Water Supply Well Destruction Activities (2009)......................................................................6 <br /> 2.5.5 Remedial Investigation (2008—2010) .....................................................................................6 <br /> 2.5.6 Soil Vapor Extraction Pilot Testing (2010) ...............................................................................7 <br /> 2.5.7 Removal Action Workplan........................................................................................................8 <br /> 3.0 PROPOSED SCOPE OF INVESTIGATION ACTIVITIES ................................................................9 <br /> 4.0 FIELD PROCEDURES...................................................................................................................11 <br /> 4.1 PERSONNEL AND PROCEDURES.....................................................................................................11 <br /> 4.2 PERMITTING AND ACCESS .............................................................................................................11 <br /> 4.3 HEALTH AND SAFETY PLAN............................................................................................................11 <br /> 4.4 UTILITY CLEARANCE.....................................................................................................................11 <br /> 4.5 DRILLING AND SOIL SAMPLING PROCEDURES..................................................................................12 <br /> 4.6 TRENCHING PROCEDURES.............................................................................................................13 <br /> 4.7 SOIL GAS PROBE INSTALLATION PROCEDURES...............................................................................14 <br /> 4.7.1 Dual-Depth Semi-Permanent Soil Gas Probe Construction...................................................14 <br /> 4.8 SOIL GAS SAMPLE COLLECTION PROCEDURES ...............................................................................15 <br /> 4.8.1 Equilibration Time..................................................................................................................15 <br /> 4.8.2 Leak Test...............................................................................................................................15 <br /> 4.8.3 Purge Volume Test................................................................................................................16 <br /> Q RRA PACIFIC GROUP Page ii April 4, 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.