Laserfiche WebLink
Pre-Design Investigation Workplan <br /> Former Manufactured Gas Plant—Lodi, California <br /> 4.8.4 Soil Gas Purging and Sample Collection...............................................................................17 <br /> 4.9 DECONTAMINATION AND WASTE MANAGEMENT PROCEDURES..........................................................18 <br /> 5.0 QUALITY ASSURANCE/QUALITY CONTROL PLAN..................................................................19 <br /> 6.0 REPORTING AND SCHEDULE.....................................................................................................20 <br /> 6.1 REPORTING..................................................................................................................................20 <br /> 6.2 SCHEDULE...................................................................................................................................20 <br /> 7.0 References....................................................................................................................................21 <br /> LIST OF TABLES <br /> Table No. Title <br /> 1 Proposed Sampling Program <br /> LIST OF FIGURES <br /> Figure No. Title <br /> 1 Site Location Map <br /> 2 Site Plan <br /> 3 Historical MGP Features and Previous Sample Locations <br /> 4 Excavation Plan showing Proposed Pre-Design Sample <br /> Locations <br /> 5 Typical Temporary Soil gas Probe Construction Diagram <br /> LIST OF APPENDICES <br /> Appendix Contents <br /> A Analytical Summary Tables for Soil, Soil Gas, and Groundwater Samples <br /> B Site Plan showing Elevated Contaminant of Concern Concentrations in <br /> Soil <br /> C Quality Assurance—Quality Control Plan <br /> TERRA PACIFIC GROUP Page iii April 4, 2012 <br />