Laserfiche WebLink
Pre-Design Investigation Workplan <br /> Former Manufactured Gas Plant—Lodi, California <br /> consist of sampling ambient air through an unused, assembled probe tip and 1 to 2-foot '/4-inch <br /> Teflon tubing section, the associated fittings and valves, and into an appropriately decontaminated <br /> SummaTM canister to verify and document the soil gas probe equipment is not contributing to soil <br /> gas sample detections. An equipment blank will be collected at a rate of one per batch of new <br /> tubing used per ASGI guidance. The field blank will consist of collecting an onsite ambient air <br /> sample directly into a decontaminated SummaT'1+ canister to detect any possible interference from <br /> ambient air (i.e. ambient air background concentrations). The selected analytical laboratory will also <br /> analyze method blank samples as required by the analytical method to evaluate the analytical train in <br /> the laboratory. All field QC sample details will be recorded on a soil gas sampling form that <br /> identifies the probe at which the field QC samples were collected. Equipment and field blank <br /> samples will be collected simultaneously at locations where no recognizable sources of contaminants <br /> are being released to ambient air, including running vehicles or other operating engines. For the <br /> proposed sampling plan,a minimum of one equipment blank and one field blank will be collected. <br /> All soil gas samples will be appropriately labeled using securely attached labels and waterproof <br /> marker at the time of sample collection. Soil gas sample labels will include the sample ID, soil gas <br /> probe name and depth, and the date and time of sample collection. Chain-of-custody forms will be <br /> completed on-site following sample collection. The samples will be placed in a cool, dry container <br /> for transportation to the laboratory. <br /> 4.9 DECONTAMINATION AND WASTE MANAGEMENT PROCEDURES <br /> The drilling and sampling equipment will be decontaminated between each sample collection point <br /> and following completion of each soil boring to avoid cross-contamination between sample <br /> locations. Before, during, and following drilling operations, direct push and hollow-stem auger <br /> drilling equipment will be thoroughly cleaned using a high pressure hot water (steam) washer. <br /> Sampling equipment and any tools, measuring devices, or other equipment which comes in contact <br /> with soil will be washed in a low-phosphate soap and water solution, and rinsed in distilled water <br /> before each use. <br /> Soil cuttings and rinsate generated during the drilling and sampling activities will be contained in <br /> Department of Transportation (DOT)-rated 55-gallon steel drums, or sealed roll-off bins. The <br /> containers will be temporarily stored on-site until characterization results are received, waste <br /> profiling is complete, and arrangements for off-site disposal can be made. All transportation and <br /> disposal activities will be conducted using appropriate manifests and documentation. <br /> TERRA PACIFIC GROUP Page 18 April 4, 2012 <br />