My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FIELD DOCUMENTS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
FIELD DOCUMENTS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 3:32:58 PM
Creation date
11/12/2019 3:15:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
FIELD DOCUMENTS
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Philip-Goalwin - 2 - December 19, 2007 <br /> and the wells that were split sampled by staff during the fourth quarter 2007 monitoring event, <br /> which was a reduced-frequency monitoring event. <br /> Well Listed in Original Recommended Key Wells Split Sampled <br /> PFP Contract Wells for Clarification Fourth Qtr 2007 <br /> EX-1 BB EX1-13113 EX1-BB <br /> MW-06 (City Well) MW-06 (City Well MW-06 (City Well) <br /> EX-1 (unknown equivalent) <br /> MW-1 (=MW-1 BB) MW-111313 <br /> MW-7 (unknown equivalent) <br /> MW-8 (=MW-8BB) MW-811313 MW-8BB <br /> MW-9 (=MW-9BB) MW-9113113 MW-9BB <br /> MW-7BB MW-7113113 MW-7BB <br /> MW-19 (=MW-19BB) MW-19BB MW-19BB <br /> MW-4113113 MW-4BB <br /> MW-6BB MW-6BB <br /> MW-16BB <br /> Once we have resolved the list of Key Wells, the 30-day public comment period has been <br /> completed, and any questions or concerns raised during that period have been addressed, the <br /> RAP can be finalized. <br /> Also, on April 27, 2007, the Regional Water Board concurred with the proposal to install one <br /> additional deep monitoring well, and with the proposed location near the corner of E. Walnut <br /> and S. Main. It is our understanding that well installation will be completed before the end of <br /> 2007, and that the deep well installation report will be included with the Fourth Quarter <br /> Groundwater Monitoring Report to be submitted in early 2008. <br /> If you have any questions or comments, please contact Marie McCrink at 916-464-4816, or by <br /> email at mtmccrink(a-).waterboards.ca.clov. <br /> MARIE T. McCRINK, P.G., C.H. <br /> Associate Engineering Geolgoist <br /> Site Cleanup Program <br /> cc: Mr. Dennis Zaragoza, Esq., San Francisco <br /> Mr. Gregg Brandin, E2C Remediation, Roseville <br /> Mr. Richard Prima, Public Works Director, City of Lodi, Lodi <br /> Mr. Harlan Knoll, San Joaquin County Environmental Health, Stockton <br />
The URL can be used to link to this page
Your browser does not support the video tag.