My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
California Regional Water Quality Control Board (' , <br /> Central Valley Region C �t <br /> Terry Tamminen Robert Schneider,Chair <br /> Secretary for Sacramento Main Office Arnold zenegger <br /> Governor <br /> Environmental Internet Address: http://www.swrcb.ca.gov/rwgcb5 <br /> Protection 11020 Sun Center Drive#200 Rancho Cordova,CA 95670-6114 <br /> Phone(916)464-3291 <br /> F <br /> October 13, 2004 <br /> Former Busy Bee Cleaners OCT 15 2004 <br /> c/o Mr. Joseph Salazar, Jr., Attorney at Law ENVRuMVIENT HEALTH <br /> Mayall,Hurley, Knutsen, Smith and Green PERMIT/SERVICES <br /> 2453 Grand Canal Blvd., Second Floor <br /> Stockton, CA 95207-8253 <br /> WORK PLAN FOR ADDITIONAL GROUND WATER CHARACTERIZATION AND SOIL VAPOR <br /> EXTRACTION/GROUNDWATER AIR SPARGE PILOT TESTING, FORMER BUSY BEE <br /> CLEANERS;SANJOAQUIN COUNTY <br /> The California Central Valley Regional Water Quality Control Board (Regional Board) has reviewed <br /> your submittal entitled"Workplan for Additional Groundwater Characterization and Soil Vapor <br /> Extraction/Groundwater Air Sparge Pilot Testing" dated September 2004 and prepared by E2C <br /> Remediation. Regional Board staff comments on the document are provided below. <br /> Background <br /> In April, 2004, Busy Bee submitted a document entitled"Draft Remedial Investigation Report, <br /> Workplan for Installation of Additional Downgradient Monitoring Well and Workplan for Focused <br /> Feasibility Study". Based on discussions with Regional Board staff on June 3 and August 12, 2004, <br /> Busy Bee decided to hold finalization of the RDFS report until the remaining characterization and <br /> treatability studies have been completed. <br /> In the work plan, Busy Bee proposes to install additional groundwater monitoring wells,perform soil <br /> vapor extraction (SVE) testing and groundwater air sparging (GAS)pilot studies at the Busy Bee site. A <br /> summary of the proposed work follows: <br /> 1. A groundwater monitoring well will be installed approximately 400 feet down gradient(south) of <br /> the southernmost monitoring well. Samples from the southernmost well contained 5.0 µg/1 PCE <br /> in January 2004 and 4.0 µg/1 PCE in May 2004. <br /> 2. A groundwater monitoring well will be installed in a data gap area along the central axis of the <br /> plume (on Main Street between Oak and Pine Streets). <br /> 3. Ten SVE extraction wells and 19-SVE observation wells will be installed. Three separate SVE <br /> pilot systems will be used, one in each of the following three test areas; source area, mid-plume <br /> and downgradient plume areas. <br /> California Environmental Protection Agency <br /> cd Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.