My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Former Busy Bee Cleaners <br /> SVE/Sparging Pilot Test Work Plan - 2 - 10/13/04 <br /> 4. Thirteen air sparge injection wells and 26-air sparge monitoring wells will be installed. Air <br /> sparge testing will be conducted on the mid-plume and downgradient plume areas. <br /> Comments <br /> 1. The proposed equipment will create noise. Noise levels should be monitored and measures <br /> implemented, if necessary, to prevent noise levels that would unreasonably disturb the peace and <br /> quiet of the neighborhood. <br /> 2. Warning signs and barricades should be erected to prevent pedestrian and motorist accidents <br /> caused by open trenches and other project related hazards. <br /> 3. Public notice of Busy Bee's activities should be provided through the preparation and <br /> distribution of a fact sheet, publication of a notice in the newspaper, and by making the work <br /> plan available for public review. <br /> Subject to Busy Bee's compliance with the above comments, Regional Board staff concurs with work <br /> plan. One week prior to the beginning of the fieldwork,please provide Regional Board staff with notice <br /> and a more detailed schedule of construction and testing activities. <br /> If you have any questions, please contact me at(916) 464-4712, or by email at <br /> austind@rb5s.swrcb.ca.gov. <br /> DUNCAN AUSTIN, P.E. <br /> Water Resources Control Engineer <br /> cc: Harlin Knoll, San Joaquin County Public Health Services, Stockton <br /> Phillip Goalwin,EZC Remediation, Bakersfield <br /> Phil Smith, Treadwell and Rollo, San Francisco <br /> Richard Prima, Director of Public Works, Lodi <br />
The URL can be used to link to this page
Your browser does not support the video tag.