My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
40
>
2900 - Site Mitigation Program
>
PR0518875
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2019 4:04:13 PM
Creation date
11/12/2019 3:19:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518875
PE
2960
FACILITY_ID
FA0014182
FACILITY_NAME
FORMER BUSY BEE CLEANERS
STREET_NUMBER
40
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
01
SITE_LOCATION
40 N MAIN ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mike Vivas <br /> 8/06/02 <br /> Page 2 <br /> comments pertained to analytical data quality objectives and on a better presentation of <br /> proposed sampling locations. <br /> General Comments <br /> The revised Workplan Addendum does not address all of the comments provided by HERD <br /> on December 13, 2001. If the comments pertaining to the laboratory data quality objectives <br /> and the performance of the human health risk assessment will be incorporated in a separate <br /> report (Task 5), then this should be stated in the revised Workplan Addendum. <br /> Specific Comments <br /> 1. The revised Addendum does not address HERD's comment to present the detailed <br /> calculations that support Dr. Byard's risk estimates. Instead, this discussion was deleted <br /> from the revised Addendum. Please clarify whether this deletion should be considered <br /> as a response to HERD's comment. <br /> 2. Section 4.2, Task 2— Indoor and Ambient Air Sampling. One of the listed considerations <br /> for possibly adjusting sample locations is the most recent wind pattern data. This <br /> addresses HERD's comments about showing the wind rose data. This information <br /> should be included in subsequent reports. <br /> Information from Magellan Environmental Inc. indicates that the modified HVAC system <br /> will be operational 24 hours a day. It is HERD's understanding, however, that the HVAC <br /> system is currently turned off at night. HERD recommends that, until the HVAC system <br /> is being operated 24 hours a day, indoor air samples should be collected to represent <br /> different conditions: <br /> 1. At the start of the work day (before the HVAC is turned on), <br /> 2. During the course of a work day (while the HVAC is operating), <br /> 3. At night while the HVAC is turned off. <br /> HERD also recommends that there should be multiple sampling events due to the <br /> potential influence of temporal factors on vapor intrusion into buildings. <br /> Conclusions and Recommendations <br /> While the revised Workplan Addendum addressed some of HERD's comments, clarification <br /> should be provided regarding the sampling approach, i.e., proposed sampling time periods, <br /> frequency. HERD recommends that, wherever feasible, soil gas samples should be <br /> collected beneath the building where indoor air samples will be collected so that predicted <br /> concentrations of indoor air could be validated by the measured indoor air concentrations. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.